top of page

355 - AV-TT03 | Shaft & Winder Shift Change and Near Miss Toolbox Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95

AV-TT03 — SHAFT & WINDER SHIFT CHANGE AND NEAR MISS TOOLBOX TALK

A new shaft shift may inherit rope tension, an incomplete brake test or an unsafe lifting exclusion. AV-TT03 is the editable shift-change and near-miss briefing that turns the previous crew's lessons into a specific isolation, inspection and reinstatement discussion.

WHERE AND WHEN THE MINE CREW USES THIS

Present it to the incoming mine winder maintenance and rigging crew before entering the controlled shaft work area. Identify changed instructions, unresolved incidents, continuing isolations and actions left from the prior shift. Repeat following changed mine permits, hazards or shifts.

SIX ACTUAL WORKFACE BRIEFING CONTROLS

1. Energy and stored tension in ropes, brakes and counterweights isolated

2. Independent anchorage, lifting, dropped-object and shaft barricade plans approved

3. Inspection scope covers guides, headgear, ropes, stations and signalling as applicable

4. Mine authorised competent inspector witnesses safety-device and brake tests

5. Worker access and evacuation remain separate from conveyance work envelope

6. Shaft authority signs reinstatement and updated equipment inspection record

HOW TO FILL IN THE GENUINE WORD FIELDS

Complete MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER; brief all six printed controls in order from stored-energy isolation to formal shaft reinstatement. Capture up to 16 actual participants with NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE, but retain separate incident/defect records.

IMPORTANT SHAFT-ENGINEERING DECISION

Check independent lifting anchors, dropped-object barriers, inspection scope, competent mine-witnessed brake testing and escape separation before shift turnover is accepted. A previous worker's verbal assurance never substitutes for mine-owned equipment clearance.

STOP, WITHDRAW AND OPERATOR RELEASE

The source lists unknown conveyance status, unsecured shaft opening, unproved brake or absent winder control as STOP / WITHDRAW / NOTIFY MINE CONTROL triggers. The mine-authorised official must release the affected zone or system before restart.

SOURCE-ORIGINAL WORD, SINGLES AND LARGER PRODUCTS

The R12.95 editable AV-TT03 original is also included in the 371-document Underground Mining Checklist Package and the 628-page complete Contractor H&S File. Existing owners already have this form and need not buy it again. Mine COPs, actual permits and competent approvals govern site use.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

Underground Mining Checklist Package — 371 original forms

Complete 628-page Underground Mining Contractor H&S File

    bottom of page