top of page

354 - AV-TT02 | Mine UAV Operating Interface & Handover

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying Singles: buy five for four, ten for eight or fifteen for twelve. Confirm the saving at checkout.

Browse individual checklists

354 / AV-TT02 — SURVEY, DRONES & AUTONOMOUS MINE SYSTEMS — OPERATING INTERFACE AND HANDOVER

AV-TT02 is an original one-page editable Word toolbox talk focused on the interfaces between survey/UAV operations, mine blasting, haulage and autonomous fleets. It is designed to brief crews before work crosses the boundaries of flight permission, mine dispatch, active machine zones and shift handover.

WHY OPERATING INTERFACES NEED A HANDOVER

A UAV mission may be flight-authorised but still conflict with a blasting schedule or occupied autonomous haul route. The talk requires deconfliction, machine-safe testing, protected geodetic controls and a clear handover of measurement and software changes. It makes the operational interface explicit rather than treating survey as an isolated technical job.

THE SIX ORIGINAL PRINTED WORKFACE CONTROLS

1. Deconflict laser/UAV routes and blast schedules from mine aerial or ground operations. 2. Confirm autonomous-fleet operating zones, geofences and exclusion boundaries before access. 3. Maintain remote-control fail-safe stop and proximity alerts during testing.

4. Protect control-network calibration and the geodetic datum against accidental reset. 5. Assign spotters, communications and lost-link contingency for UAV/remote systems. 6. Independently verify recorded measurements, geofence changes and software revision. These are the six source briefing statements in actual order, with handover as the emphasis.

THE REAL ATTENDANCE AND MINE RELEASE REQUIREMENTS

Enter MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER. Deliver the printed workface briefing after a new shift, work permit, mine instruction or changed hazard. Capture the team in the 16 attendance NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE lines. This is not a standalone dispatch approval or UAV-flight permit.

The STOP / WITHDRAW / NOTIFY MINE CONTROL instruction is triggered by loss of link, an unverified autonomy geofence, unexpected machine activation or survey anomaly. Restart only after the mine-authorised official releases the affected zone or system. A successful crew briefing cannot replace that owner approval.

SINGLE TALK OR COMPLETE SURFACE MINE COLLECTION

Buy AV-TT02 individually when you need this exact crew briefing or to sample AVC's editable specialist quality. It is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and in the complete Surface Mining Contractor H&S File with A–AA core controls and other trade annexures. Existing full-file purchasers receive the identical form.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

One purchaser-licensed editable DOCX for internal project use. Follow host-mine survey, drone-flight, autonomous-fleet and control-room permissions.

    bottom of page