AV-TT01 — SHAFT & WINDER BASIC CRITICAL CONTROLS TOOLBOX TALK

Mine shaft authority work possession is the first safeguard before contractors maintain ropes, brakes, guides or headgear. AV-TT01 is the original editable basic critical-controls talk for winder engineering, aligning six actual source prompts with operator permissions and competent testing.

WHERE AND WHEN THE MINE CREW USES THIS

Use this before a relevant maintenance or shaft engineering shift. Confirm live work possession, personnel conveyance restrictions, evacuation route and the current shaft permit. Rebrief if mine hazards, shifts, permits or instructions change even where yesterday's crew was identical.

SIX ACTUAL WORKFACE BRIEFING CONTROLS

1. Winder and shaft work possession issued by mine shaft authority

2. Personnel conveyance restrictions, emergency movement and rescue plan communicated

3. Energy and stored tension in ropes, brakes and counterweights isolated

4. Independent anchorage, lifting, dropped-object and shaft barricade plans approved

5. Inspection scope covers guides, headgear, ropes, stations and signalling as applicable

6. Mine authorised competent inspector witnesses safety-device and brake tests

HOW TO FILL IN THE GENUINE WORD FIELDS

Record MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER. Explain all six printed controls in order and use the 16 original NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE lines. Workers need to identify the actual possession authority, stored-energy points and brake-test witness.

IMPORTANT SHAFT-ENGINEERING DECISION

Work possession and emergency movement are different permissions. Verify rope/brake/counterweight isolation, approved lifting anchor and shaft barricades, specific inspection coverage and competent mine-witnessed safety-device/brake tests before work resumes.

STOP, WITHDRAW AND OPERATOR RELEASE

The source lists unknown conveyance status, unsecured shaft opening, unproved brake or absent winder control as STOP / WITHDRAW / NOTIFY MINE CONTROL triggers. The mine-authorised official must release the affected zone or system before restart.

SOURCE-ORIGINAL WORD, SINGLES AND LARGER PRODUCTS

The R12.95 editable AV-TT01 original is also included in the 371-document Underground Mining Checklist Package and the 628-page complete Contractor H&S File. Existing owners already have this form and need not buy it again. Mine COPs, actual permits and competent approvals govern site use.