352 - AV-T01 | Mine UAV Survey Inspection & Acceptance Tests
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Qualifying Singles: five for four, ten for eight or fifteen for twelve. Confirm the cart saving.
352 / AV-T01 — MINE UAV SURVEY INSPECTION, MEASUREMENTS & ACCEPTANCE TESTS
This original one-page editable Word acceptance-evidence register lets surface-mine contractors document actual inspection results and thresholds for surveying, UAV operations and autonomous fleet interfaces. It links flight authorisation, changed geofences, measured results and mine-controlled restart decisions.
WHY ACCEPTANCE RESULTS NEED MEASURED PROOF
Flight approval alone does not prove the route avoids blasting or fleet boundaries and remote fail-safes are accepted. AV-T01 turns safety-critical survey and autonomy interfaces into documented verification before returning a system to dispatch. It requires genuine measured values, original evidence and a mine authority decision—not an unsupported pass.
THE SEVEN ACTUAL NUMBERED SOURCE CONTROLS
1. Deconflict laser/UAV route and blast schedule from mine aerial or ground operations. 2. Confirm fleet autonomous zones, geofences and exclusion boundaries before access. 3. Maintain remote-control fail-safe stop and proximity alerts during testing. 4. Protect control-network calibration and geodetic datum against accidental reset.
5. Define spotters, communication and lost-link contingency for UAV/remote systems. 6. Independently check recorded measurements, geofence changes and software revision. 7. Mine survey/fleet authority signs revised maps, safety-critical settings and reactivation. These are the exact seven printed verification subjects.
COMPLETE THE ORIGINAL RESULT / AUTHORITY COLUMNS
Enter MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. For every row use MINING-SPECIFIC ITEM / EVIDENCE TO TRACK, DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS. Record flight, survey QA, software configuration and dispatch-release evidence; attach original approvals and test records.
Use OUTSTANDING DEFECT / NCR / REINSPECTION / RETENTION FILE REF for unfinished issues. Separate CONTRACTOR SUPERVISOR / SIGNATURE and MINE RELEASE AUTHORITY / SIGNATURE plus DATE / RELEASE REF establish accountability. Measured evidence is not a substitute for authorised mine flight, access or fleet restart.
THIS SINGLE OR THE COMPLETE SURFACE MINE COLLECTION
Buy AV-T01 alone for this exact test/acceptance record or to inspect AVC's editable technical source. The identical Word file is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and in the complete Contractor H&S File with A–AA core controls and specialist annexures. Full-file buyers already receive this record.
386-document Surface Mining Checklist Package
Complete Surface Mining Contractor H&S File
One original purchaser-licensed editable DOCX for internal mine project use; follow the host's survey, aviation, fleet and reactivation rules.

