348 - AV-R01 | Mine Survey & UAV Competence, Permits & Plant ID
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Qualifying Singles: five for four, ten for eight or fifteen for twelve. Confirm the cart offer.
348 / AV-R01 — MINE SURVEY & UAV COMPETENCE, PERMITS AND PLANT IDENTIFICATION
AV-R01 is an original one-page editable Word evidence register for mine surveying, UAV flight and autonomous-system workpacks. It links the mine zone, work order, permit, supervisor and relevant plant to real safety and operating approvals rather than assumed competence.
WHY PERMITS AND PLANT ID MATTER
A competent drone team may still enter a blast zone, cross an active haul route or operate near autonomous equipment with unverified boundaries. AV-R01 ties mine operations/security flight approval, plant identification and competence evidence to recorded permissions before mobilisation.
THE SEVEN ACTUAL PRINTED SOURCE CONTROLS
1. Survey/UAV flight area approved by mine operations and security. 2. Laser/UAV routes and blast schedule deconflicted from mine aerial/ground operations. 3. Autonomous fleet zones, geofences and exclusion boundaries verified before entry. 4. Remote-control fail-safe stop and proximity alerts maintained during testing.
5. Control-network calibration and geodetic datum protected from accidental reset. 6. Spotters, communications and lost-link contingency defined for UAV/remote systems. 7. Recorded measurements, altered geofences and software revision independently checked. These are the seven source rows in print order.
COMPLETE THE ORIGINAL EVIDENCE AND AUTHORITY FIELDS
Enter MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. Each MINING-SPECIFIC ITEM / EVIDENCE TO TRACK has DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS. Reference current UAV authorisation, mine zone permissions, equipment identity and worker competence in original workpack attachments.
Use OUTSTANDING DEFECT / NCR / REINSPECTION / RETENTION FILE REF for incomplete verification. Sign-offs separate CONTRACTOR SUPERVISOR / SIGNATURE and MINE RELEASE AUTHORITY / SIGNATURE plus DATE / RELEASE REF. The form has no dedicated certificate or plant-serial columns: those details go in the evidence references. It cannot replace mine-issued permits.
SINGLE FORM OR COMPLETE MINE RECORD COLLECTION?
Buy AV-R01 alone for this competency/permit evidence record or to sample AVC's editable source. The identical Word form is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and the complete Contractor H&S File, containing A–AA controls and specialist annexures. Full-file buyers already own this form.
386-document Surface Mining Checklist Package
Complete Surface Mining Contractor H&S File
One purchaser-licensed editable DOCX for internal mine projects. Current host flight, survey, security and autonomous operating permissions remain controlling.

