top of page

344 - AV-C03 | NDT Workface Condition & SIMOPS Inspection

R 12,95Price

Buy 4 Checklists, Get 1 Free

REAL PURPOSE OF THIS NDT / TESTING ORIGINAL

AV-C03 is the actual NINE-CONTROL WORKFACE CONDITION AND SIMULTANEOUS-OPERATIONS INSPECTION for airport testing, NDT and commissioning. Radiographic exclusion, pressure and electrical energy can collide with aircraft movements or the work of other contractors. This original checks that the approved asset, isolation and ITP hold boundary still match the airport operating window, and that testing or energisation cannot inadvertently affect passengers or live services.

WHEN AND WHO COMPLETES IT

Use before a specialist inspection/test starts, at a changed airfield operating window or whenever the test configuration, witness, exclusion or adjacent contractor activities change. Enter AIRPORT/WORK ZONE, ASSET/LOCATION, PERMIT/WORK PACKAGE and SHIFT/DATE. Match drawing revisions, work order and permit to the actual system; coordinate competent technicians, escorts, temporary restrictions and approved test routes with the airport custodian.

SOURCE-VERIFIED CONTROLS OR TALK POINTS

The nine actual Y/N/N/A checks verify (1) work scope, asset identity, isolation boundary and drawings; (2) airport permission and current safety-interface briefing; (3) authorisation, competence, supervision and escort; (4) RADIOGRAPHIC EXCLUSION measures recorded; (5) PRESSURE/ELECTRICAL ENERGY barriers and protection; (6) objective ITP/HOLD SEQUENCE evidence; (7) CERTIFIED EQUIPMENT test, inspection or release conditions understood; (8) other trades, aircraft/vehicle routes, public protection and FOD coordination; (9) STOP and notify airport custodian when operating or workfront conditions change.

EVIDENCE, SIGNATURES AND AIRPORT RELEASE

For every row the original records Y/N/N/A and EVIDENCE/DEFECT REFERENCE, then UNRESOLVED ITEMS/RESTRICTIONS, CONTRACTOR VERIFIED BY/SIGNATURE, AIRPORT RELEASE REFERENCE, EVIDENCE REF/CORRECTIVE ACTION and DATE/TIME/STATUS. An unqualified test, unapproved radiographic exposure or open energy isolation is a work hold, not an acceptable tick. This contractor form cannot issue separate testing permits or airport operational release.

SOURCE-EXACT WORD AND COMMERCIAL OPTIONS

AUTHENTIC EDITABLE WORD: This source-original individual AVC DOCX costs R12.95 and is already included in the complete 420-document Airports & Airside Checklist Package and the 659-page Airports Contractor H&S File, with wider contractor management controls. Avoid duplicate purchases. Eligible Singles may qualify for BUY 4 GET 1 FREE while the actual cart promotion is active: five cost four, ten cost eight and fifteen cost twelve. Confirm at checkout; parent bundles are excluded. Airport operator permits, NDT/radiography authorisations, technical testing approval and external operational release remain essential.

Browse AVC Checklist Singles

420-document Airports Checklist Package

Complete 659-page Airports Safety File

    bottom of page