top of page

344 - AV-C02 | Mine UAV & Autonomy Changed Conditions Checklist

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying AVC Singles: five for the price of four; ten for eight; fifteen for twelve. Check the cart.

Browse all individual checklist Singles

344 / AV-C02 — MINE UAV & AUTONOMY CHANGED CONDITIONS, WEATHER AND EXPOSURE

AV-C02 is the original one-page editable Word changed-conditions workface checklist for mine drone, surveying and autonomous fleet work. Before a shifted task or return to work, it makes the team reconsider seven Y / N / N/A controls against the currently authorised mine zone.

REASSESS WEATHER, OPERATING CHANGES AND EXPOSURE

Weather, visibility, ground access and revised flight or machine-zone limits can invalidate a previous briefing. The original does not print a separate weather-measurements table: it verifies actual access, control-system, survey and release safeguards when conditions are no longer the same.

THE SEVEN REAL PRINTED SAFETY CHECKS

1. Fleet autonomous zones, geofences and exclusion boundaries confirmed before entry. 2. Remote-control fail-safe stop and proximity alerts maintained during testing. 3. Control-network calibration and geodetic datum protected against accidental reset. 4. Spotters, communications and lost-link contingency defined for UAV/remote work.

5. Recorded measurements, geofence changes and software revisions independently checked. 6. Mine survey/fleet authority signs revised maps, safety-critical settings and reactivation. 7. Mine operations/security authority approves the survey or UAV flight area.

HOW TO FILL THE ORIGINAL WORD RECORD

Identify MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. Every numbered WORKFACE VERIFICATION / REQUIRED CONTROL has Y / N / N/A plus EVIDENCE / DEFECT / ACTION. Record what changed, who assessed it and which mine work order/COP supports each finding; attach authentic system, survey, flight or permission records.

The printed HOLD direction is to STOP for missing clearance, isolation, protection or critical evidence and reassess changed conditions. Contractor supervisor and mine release authority sign separately with DATE / RELEASE REF. This listing is AV-C02 for UAV/autonomous systems, not the separate AW-C02 mine rail form.

INDIVIDUAL FORM OR COMPLETE SURFACE MINE COLLECTION?

Every AVC Single is one purchaser-licensed editable DOCX for internal project use. Use your host mine's current permits, competent personnel and operating procedures. This same original document is INCLUDED in the full 386-document Surface Mining Checklist Package and complete Contractor H&S File with A–AA core controls and specialist trade annexures; collection buyers already own it.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page