341 - AV-C02 | NDT Final Inspection & Airport Handover Check
Buy 4 Checklists, Get 1 Free
REAL PURPOSE OF THIS NDT / TESTING ORIGINAL
AV-C02 is the source-original EIGHT-CONTROL FINAL INSPECTION AND AIRPORT HANDOVER checklist for inspection, NDT, testing and commissioning. A successful specialist test is not enough if temporary exclusions, isolation devices, test bypasses, unsatisfied defects or unclosed airport permits remain. The form makes contractors present a documentary and physical closeout for the actual work area before the airport operating owner reviews functional serviceability.
WHEN AND WHO COMPLETES IT
Complete only after the real tests, FOD inspections, permit closure and required operational acceptance. Enter AIRPORT/AREA, CONTRACTOR, WORK ORDER and AREA/SHIFT. Correlate the work scope and changes with approved records, verify the test method and equipment calibration, close radiographic or energy exclusions, confirm a return-to-normal functional witness and present the corrected or outstanding items to the AIRPORT/CLIENT REVIEWER.
SOURCE-VERIFIED CONTROLS OR TALK POINTS
The EIGHT real YES/NO/N/A controls require (1) work scope, installed assets and changes match approved documents; (2) COMPETENT TEST METHOD AND CALIBRATION; (3) TEMPORARY EXCLUSION/ENERGY ISOLATION approval; (4) independent test and defect records; (5) RETURN-TO-NORMAL FUNCTIONAL WITNESS; (6) all tools, materials, barriers and FOD reconciled; (7) permits, isolations and temporary restrictions formally closed; (8) OPERATIONAL OWNER SIGNOFF.
EVIDENCE, SIGNATURES AND AIRPORT RELEASE
The original table provides CONTROL/EVIDENCE and separate YES, NO and N/A columns, with ACTION/PERMIT/EVIDENCE REFERENCE, COMPLETED BY, AIRPORT/CLIENT REVIEWER and DATE/SIGN. Record the actual acceptance and any unresolved temporary bypass. The footnote expressly states that controlled airport permits or release come only from the airport or airside operational authority, not from the contractor checklist.
SOURCE-EXACT WORD AND COMMERCIAL OPTIONS
AUTHENTIC EDITABLE WORD: This source-original individual AVC DOCX costs R12.95 and is already included in the complete 420-document Airports & Airside Checklist Package and the 659-page Airports Contractor H&S File, with wider contractor management controls. Avoid duplicate purchases. Eligible Singles may qualify for BUY 4 GET 1 FREE while the actual cart promotion is active: five cost four, ten cost eight and fifteen cost twelve. Confirm at checkout; parent bundles are excluded. Airport operator permits, NDT/radiography authorisations, technical testing approval and external operational release remain essential.

