339 - AU-TT02 | Shotcrete, Lining & Grouting Safe Handover Toolbox Talk
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95
AU-TT02 — SHOTCRETE, LINING & GROUTING SAFE HANDOVER TOOLBOX TALK
Handing back a sprayed lining or grout bay requires material traceability, safe spray equipment and mine approval. AU-TT02 is the original editable safe-handover toolbox talk beginning with material mix, batch, expiry, set time and chemical hazards.
WHERE AND WHEN THIS MINE FORM IS USED
Use the talk when a shotcrete or rehabilitation workface is transferred to mine operations or another contractor. Identify the current curing and strength holds, drainage controls and unsupported ground restrictions before any re-entry.
SIX PRINTED TOOLBOX CONTROLS
1. Material mix, batch, expiry, set time and chemical hazards recorded
2. High-pressure hose, rebound and splash exposures controlled
3. Ventilation and dust/mist capture adequate for spray and curing operations
4. No workers exposed to unsupported ground during substrate preparation
5. Substrate tests, thickness checks, strength verification and cure holds defined
6. Runoff and washout protected against mine drainage and contamination
HOW TO COMPLETE THE SOURCE RECORD
Fill MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER and brief the six printed interface checks. Its 16 NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE lines record briefing attendance, not the engineer's technical release.
MINE-WORKFACE HAZARD AND QUALITY DECISION
The source moves through mix evidence, high-pressure hose/rebound, ventilation, substrate ground support, strength/cure tests and runoff protection. A visible coat alone does not prove design thickness or safe entry.
STOP, WITHDRAW OR HOLD FOR MINE RELEASE
The source orders STOP / WITHDRAW / NOTIFY MINE CONTROL for support design deviations, abnormal ground movement or failed strength/lining holds. Restart only after release by the mine-authorised official.
ORIGINAL WORD SINGLE OR THE COMPLETE COLLECTIONS
The original editable AU-TT02 Word file is R12.95 and is already included in the 371-form Underground Mining Checklist Package and full 628-page Contractor H&S File. Existing parent-product owners need not buy twice. Live mine permits and rock-engineering approvals still govern use.
THREE BLUE AVC PRODUCT LINKS
Browse AVC editable checklist Singles

