AU-R03 — SHOTCRETE WORK RESULTS, MEASUREMENTS AND EVIDENCE REGISTER
AU-R03 captures measured work results and supporting proof for actual underground sprayed concrete, resin, grout and rehabilitation. Seven source rows separate rock-engineering design approval and true mix identification from spray, ground, strength and runoff evidence.
WHERE AND WHEN THIS SOURCE REGISTER IS USED
Use it during inspection and technical close-out at a defined shaft/tunnel heading, lined face or grout injection zone. Record MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. Relate each result to the real workface and the mine-controlled inspection requirements.
SEVEN ORIGINAL TECHNICAL EVIDENCE CHECKS
1. Rock engineering approves design thickness, sequencing and substrate condition
2. Material mix, batch, expiry, set time and chemical hazards recorded
3. High-pressure hose, rebound and splash exposures controlled
4. Ventilation and dust/mist capture adequate for spray and curing operations
5. No workers exposed to unsupported ground during substrate preparation
6. Substrate tests, thickness checks, strength verification and cure holds defined
7. Runoff and washout protected against mine drainage and contamination
HOW TO COMPLETE THE GENUINE TABLE
Complete the seven-row # / MINING-SPECIFIC ITEM / EVIDENCE TO TRACK / DOCUMENT / RESULT / MEASURED VALUE / DATE / AUTHORITY / STATUS fields with actual readings, batch references and source revisions. Retain test certificates and approvals; do not fill missing results with assumed PASS or unexplained blanks.
DEFECTS, SIGN-OFF AND OPERATOR RE-ENTRY
Use OUTSTANDING DEFECT / NCR / REINSPECTION / RETENTION FILE REF and REVIEW / CLOSE-OUT AND EVIDENCE REFERENCES. Obtain contractor supervisor and host mine authority sign-off where required, with the actual Date / release reference. An incomplete result stays outstanding.
THE EDITABLE WORD SINGLE OR TWO FULL COLLECTIONS