top of page

333 - AU-R01 | Shotcrete Competence, Permits and Equipment Register

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD R12.95

AU-R01 — SHOTCRETE COMPETENCE, PERMITS AND EQUIPMENT REGISTER

Before underground spraying, grouting or lining rehabilitation begins, a contractor needs genuine permits, competence and equipment approval evidence tied to rock-engineering limits. AU-R01 is the original seven-control competence, permits and equipment authorisation register, not a licence created by the template.

WHERE AND WHEN THIS SOURCE REGISTER IS USED

Prepare it before deploying mixing, pumping, spraying, injection or curing teams to the approved mine area. Record MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR, and correlate crew qualifications, pumping system checks and permitted methods to that work order.

SEVEN ORIGINAL TECHNICAL EVIDENCE CHECKS

1. Rock engineering approves design thickness, sequencing and substrate condition

2. Material mix, batch, expiry, set time and chemical hazards recorded

3. High-pressure hose, rebound and splash exposures controlled

4. Ventilation and dust/mist capture adequate for spray and curing operations

5. No workers exposed to unsupported ground during substrate preparation

6. Substrate tests, thickness checks, strength verification and cure holds defined

7. Runoff and washout protected against mine drainage and contamination

HOW TO COMPLETE THE GENUINE TABLE

Record each of the seven MINING-SPECIFIC ITEM / EVIDENCE TO TRACK lines with the appropriate DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS. Cite only valid mine appointments, equipment inspection and permit documentation, and original revisions; retain certificates and leave no unexplained blanks.

DEFECTS, SIGN-OFF AND OPERATOR RE-ENTRY

Use OUTSTANDING DEFECT / NCR / REINSPECTION / RETENTION FILE REF and REVIEW / CLOSE-OUT AND EVIDENCE REFERENCES. Obtain contractor supervisor and host mine authority sign-off where required, with the actual Date / release reference. An incomplete result stays outstanding.

THE EDITABLE WORD SINGLE OR TWO FULL COLLECTIONS

This R12.95 source-original editable AU-R01 Word form is already included in the 371-document Underground Mining Checklist Package and the full 628-page Contractor H&S File. Owners of either parent should not buy it twice. Actual mine COPs, permits and engineering approvals govern use.

THREE BLUE AVC LINKS

Browse AVC original editable checklist Singles

Underground Mining Checklist Package — 371 original forms

Complete Underground Mining Contractor H&S File — 628 pages

    bottom of page