top of page

332 - AU-H02 | Shotcrete Independent Witness Hold and Release

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD R12.95

AU-H02 — SHOTCRETE INDEPENDENT WITNESS HOLD AND RELEASE

AU-H02 is the source-original five-gate independent-witness hold and release form for underground sprayed concrete, grout and rehabilitation. The contractor cannot grant a mine re-entry permission because a spray layer appears complete: separate proof and witnesses are required for all applicable hold gates.

WHERE AND WHEN THIS SOURCE REGISTER IS USED

Use it at mine-controlled quality, support, ventilation, ground access or dewatering hold points before another contractor or mine crew enters the lined zone. Enter MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. Operator-owned release is recorded by reference only.

FIVE PRINTED INDEPENDENT WITNESS HOLD GATES

1. High-pressure hose, rebound and splash exposures controlled

2. Ventilation and dust/mist capture adequate for spray and curing operations

3. No workers exposed to unsupported ground during substrate preparation

4. Substrate tests, thickness checks, strength verification and cure holds defined

5. Runoff and washout protected against mine drainage and contamination

HOW TO COMPLETE THE GENUINE TABLE

The real witness table has HOLD TRIGGER / EVIDENCE GATE, REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS. Capture actual test records, safe access proof, verification results and the responsible named witness for each of five source printed conditions; an absent witness is not an accepted gate.

DEFECTS, SIGN-OFF AND OPERATOR RE-ENTRY

All applicable hold items must PASS, proof must trace to the approved mine work order, and defects must be corrected and witnessed. Contractor supervisor and host mine authority signatures and the Date / release reference document only the actual mine-official release.

THE EDITABLE WORD SINGLE OR TWO FULL COLLECTIONS

This R12.95 source-original editable AU-H02 Word form is already included in the 371-document Underground Mining Checklist Package and the full 628-page Contractor H&S File. Owners of either parent should not buy it twice. Actual mine COPs, permits and engineering approvals govern use.

THREE BLUE AVC LINKS

Browse AVC original editable checklist Singles

Underground Mining Checklist Package — 371 original forms

Complete Underground Mining Contractor H&S File — 628 pages

    bottom of page