top of page

328 - AU-C01 | Shotcrete Workface Prestart Checklist

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — EDITABLE WORD ORIGINAL R12.95

AU-C01 — SHOTCRETE WORKFACE PRESTART CHECKLIST

AU-C01 is the actual source-original prestart checklist for underground shotcrete, grout and lining. Its first printed control requires rock-engineering approval of the design thickness, spray sequence and substrate before work begins.

WHEN THIS MINE FORM APPLIES

Use it before spraying or grout injection at a specified mine face or rehabilitation area. Record MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR and confirm that the workface corresponds to the permitted ground support scope.

SEVEN PRINTED WORKFACE CONTROLS

1. Rock engineering approves design thickness, sequencing and substrate condition

2. Material mix, batch, expiry, set time and chemical hazards recorded

3. High-pressure hose, rebound and splash exposures controlled

4. Ventilation and dust/mist capture adequate for spray and curing operations

5. No workers exposed to unsupported ground during substrate preparation

6. Substrate tests, thickness checks, strength verification and cure holds defined

7. Runoff and washout protected against mine drainage and contamination

HOW TO COMPLETE THE EXACT SOURCE FIELDS

Mark each of seven WORKFACE VERIFICATION / REQUIRED CONTROL items with Y, N or N/A and record EVIDENCE / DEFECT / ACTION. Attach actual design/mix approval, hose pressure and exclusion evidence, ventilation conditions, supported-ground boundaries, curing/strength holds and washout management.

WHY THIS SOURCE RECORD MATTERS

The source explicitly requires HOLD when mine clearance, isolation, emergency system, support condition or critical proof is missing and reassessment after changed shifts or conditions. An unsigned prestart cannot substitute for operator permission.

STOP, REVIEW AND MINE AUTHORITY

The source HOLD instruction requires stopping for missing mine clearance, isolation, emergency system, ground support or critical proof. Record review/close-out evidence and contractor and host mine signatures where required; approval remains mine-owned.

EDITABLE WORD OR COMPLETE UNDERGROUND COLLECTIONS

The source-identical AU-C01 Word original is R12.95. This form is already included in the 371-document Underground Mining Checklist Package and complete 628-page Underground Mining Contractor H&S File, so owners of either parent do not need to buy it twice. Current mine COPs, valid permits and competent appointments govern use.

THREE BLUE AVC CROSS-LINKS

Browse AVC original checklist Singles

Underground Mining Checklist Package — 371 originals

Complete 628-page Underground Mining Contractor H&S File

    bottom of page