top of page

326 - AT-TT04 | Blast Area Failure Recognition & Withdrawal Toolbox Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — EDITABLE WORD ORIGINAL R12.95

AT-TT04 — BLAST AREA FAILURE RECOGNITION & WITHDRAWAL TOOLBOX TALK

AT-TT04 is the original failure-recognition and withdrawal toolbox talk for contractor services near mine-controlled blast exclusions. It begins with written mine blasting-officer re-entry release instead of assuming the scheduled blasting is finished.

WHERE AND WHEN TO USE THIS ORIGINAL

Brief support crews before work near an underground blast area, repeating after changed hazards, shifts, permits or mine instructions. Identify the exclusion, current mine-controlled status, communications and official responsible for clearance.

SIX SOURCE MINE-INTERFACE CONTROLS

1. Mine blasting officer provides written area re-entry release before work resumes

2. Contractor materials and tools accounted for before area evacuation

3. Fire and static/electrical ignition risks assessed with mine authorised officials

4. Hot work, electrical, radio and mobile plant activities screened near explosives

5. Misfire and post-blast re-entry prohibitions briefed and documented

6. Blast schedule, guards, communications and clearance signals confirmed each shift

HOW TO COMPLETE THE REAL SOURCE FIELDS

Enter MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER, discuss the six source points in order and record up to 16 worker NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE attendance lines. The attendance is not a release.

STOP AND MINE AUTHORITY CONTROL

STOP / WITHDRAW / NOTIFY MINE CONTROL for unknown blast status, suspected misfire, incorrect exclusion or absent officer release. Account for contractor tools and respect mine screening of nearby activities.

DOCUMENTED RELEASE AND SOURCE EVIDENCE

The original STOP / WITHDRAW / NOTIFY MINE CONTROL rule names unknown blast status, suspected misfire, incorrect exclusion and missing mine officer release. Restart only after official permission.

THE R12.95 WORD SINGLE OR COMPLETE FILES

This source-original editable AT-TT04 Word document is already contained in the 371-document Underground Mining Checklist Package and 628-page complete Contractor H&S File. Existing owners need not buy this Single again. Mine COPs, permits, appointments and control of blasting remain with authorised mine personnel.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

Underground Mining Checklist Package — 371 forms

Complete 628-page Underground Mining Contractor H&S File

    bottom of page