325 - AT-TT03 | Fuel/Lube & Refuelling Critical Failure Modes Talk
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Confirm the cart offer.
Browse all individual checklist Singles
325 / AT-TT03 — FUEL/LUBRICANT/REFUELLING CRITICAL FAILURE MODES & NEAR-MISS LESSONS
AT-TT03 is the original editable Word mine fuel and refuelling critical-failure toolbox talk. It uses six printed safeguards to discuss the chain from residual energy or electrostatic ignition through spill/fire readiness and gas testing to meter integrity and mine-controlled restart.
WHY THIS MINE FUEL CONTROL MATTERS
A near miss in a fuel service area may involve residual pressure, damaged earthing, an uncontrolled spill, entry into an untested tank or a failed overfill cutout. The talk helps the contractor examine credible failure paths and required controls without pretending to document a particular mine incident.
THE SIX ACTUAL PRINTED TOOLBOX TALK POINTS
1. Fuel tanks, pump pressure, electrical, hydraulic and pipework isolated and drained safely. 2. Static bonding, earthing, lightning protection and transfer hoses inspected. 3. Spill booms, bunding, contaminated-soil arrangements and fire coverage ready.
4. Sampling flammable liquids or tank entry only with mine-approved permits and gas tests. 5. Meter calibration, overfill cutoff, emergency stop and leak-test evidence recorded. 6. Mine fuel/fire authority signs bund restoration and restart of fuel transfer.
THE ORIGINAL 16-SIGNATURE ATTENDANCE AND STOP RULE
Enter MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER, discuss crew duties and changed conditions, then use all 16 NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE rows. The source begins with SAFE ISOLATION, then bonding and emergency containment; the mine fuel/fire authority's acceptance of restored bund and transfer controls is LAST. It is a workface awareness discussion, not a nonconformance investigation form or a permit to sample/tank-enter. Record genuine local lessons alongside the six existing topics.
The printed STOP / WITHDRAW / NOTIFY MINE CONTROL rule applies to a leak, uncontrolled ignition risk, unknown tank atmosphere or failed overfill cutout. Restart ONLY after mine-authorised official release; this talk cannot approve tank entry or transfer.
THIS SINGLE OR THE FULL MINE COLLECTION?
The exact original purchaser-licensed editable Word file is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and in the full Surface Mining Contractor H&S File with core controls and trade annexures. Existing larger-set buyers already receive this form. Follow the mine's current fuel/fire, hazardous-area and work authorisation rules.