top of page

322 - AT-T01 | Fuel/Lube & Refuelling Inspection & Acceptance Tests

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Confirm the cart offer.

Browse all individual checklist Singles

322 / AT-T01 — FUEL/LUBRICANT/REFUELLING INSPECTION, MEASUREMENTS & ACCEPTANCE TESTS

AT-T01 is the original editable one-page Word inspection and acceptance-test evidence register for mine fuel farms, lubrication systems and refuelling equipment. Its seven numbered fields are designed to record REAL measured test results, permits and authority decisions before handover.

WHY THIS MINE FUEL CONTROL MATTERS

A fuel pump restarting or a bund appearing clean does not demonstrate transfer-meter accuracy, overfill protection, tested emergency shutdown or electrical bonding. The original separates isolation and hazardous-area readiness from measured leak/meter checks and final mine fuel/fire approval.

THE SEVEN ORIGINAL NUMBERED ACCEPTANCE EVIDENCE ROWS

1. Hazardous-area classification, ignition controls and hot-work exclusion verified. 2. Fuel tanks, pump pressure, electrical/hydraulics and transfer lines isolated and drained. 3. Static bonding, earthing, lightning protection and transfer hoses inspected. 4. Spill booms, bunds, contaminated soil and fire coverage ready.

5. Sampling of flammable liquids/tank entry only with mine permit and gas testing. 6. Meter calibration, overfill cutoff, emergency stop and leak-test evidence recorded. 7. Mine fuel/fire authority signs restored bund integrity and fuel-transfer readiness.

COMPLETE THE ORIGINAL MEASURED RESULTS AND RELEASE FIELDS

Enter MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. Each MINING-SPECIFIC ITEM / EVIDENCE TO TRACK has DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS. The printed source expressly calls for SDS, isolation, transfer-meter calibration, leak-test and environmental acceptance evidence. Record actual document/test identifiers and measured values. An open defect, gas-testing failure or unaccepted bund must remain unresolved; this is not a substitute for a permit or laboratory certification.

Use OUTSTANDING DEFECT / NCR / REINSPECTION / RETENTION FILE REF. The contractor supervisor and MINE RELEASE AUTHORITY sign separately with DATE / RELEASE REF. Contractors cannot self-certify that fuel transfer may resume.

THIS SINGLE OR THE FULL MINE COLLECTION?

The exact original purchaser-licensed editable Word file is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and in the full Surface Mining Contractor H&S File with core controls and trade annexures. Existing larger-set buyers already receive this form. Follow the mine's current fuel/fire, hazardous-area and work authorisation rules.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page