AB-H07 — BLAST EXCLUSION AND POST-BLAST RE-ENTRY GATE
You've been awarded a task inside an operating open-pit or quarry mine. Blast Exclusion and Post-Blast Re-entry Gate is a safety-critical interface that a borrowed construction template cannot resolve. This original AVC
FIVE ORIGINAL MINE-OWNED TECHNICAL HOLD GATES
1. Blast controller and exact exclusion perimeter identified.
2. People, plant and adjacent works accounted for.
3. Warnings and evacuation evidence recorded.
4. Misfire/fumes/flyrock/ground condition post-blast assessed.
5. Mine blast authority grants explicit re-entry and records time.
THE REAL PRINTED FORM AND EVIDENCE FIELDS
This ORIGINAL AB-H07 is a FIVE-STAGE mine-owned HOLD/RELEASE gate, not a generic seven-point checklist. Three printed columns are HOLD TRIGGER / EVIDENCE GATE, REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS. Each actual source gate needs the appropriate proof and witness; a blank or incorrect sign-off remains on hold.
Enter MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. The source separates CONTRACTOR SUPERVISOR / SIGNATURE from MINE RELEASE AUTHORITY / SIGNATURE and DATE / RELEASE REF. Release is recorded only after all gates and defects have been verified by the mine's appointed official.
STOP, WITHDRAW AND AWAIT MINE-AUTHORISED RELEASE
The source RELEASE instruction demands that all five evidence gates be verified, defects resolved and the competent mine official's work release recorded. Do not remove the hold based on an unsigned contractor statement; changed conditions require renewed assessment.
EDITABLE ORIGINAL WORD — COMPLETE IT FOR YOUR JOB
Fill in actual project/contractor details, the mine's permit and control references, inspections, equipment or zone identification, evidence dates and responsible people's signatures. Preserve the source order and retain outstanding work in the record until
BUY THIS SINGLE OR THE COMPLETE MINE SAFETY SYSTEM
This R12.95 Word original is ALREADY INCLUDED in the 386-document Surface, Opencast & Quarry Mining Checklist Package AND in the complete Surface Mining Contractor Health & Safety File. If you own either larger product, do not purchase the identical Single again. The full Safety File includes the broader management foundation.
Browse all original AVC Safety Checklist Singles.
Explore complete 386-document Surface Mining Checklist Package.
Discover the complete Surface Mining Contractor Safety File.
Apply actual Mine Health and Safety Act obligations, mine COP/SOP procedures and current permits. This form helps maintain traceable contractor evidence but cannot issue mining authority, geotechnical permissions, blasting approval or automatic acceptance.