AB-H06 — UNDERGROUND GROUND SUPPORT REPAIR & AREA REOCCUPATION HOLD

Five source-original mine ground-support hold gates require current workface barricading, engineer-approved support repair and competence, inspected support/shotcrete/bolting installation, verified torque/pull/strength tests, and mine ground-control authorisation to reoccupy.

APPROVED UNDERGROUND MINE WORK APPLICATION

Use during underground ground-support repairs, rehabilitation, scaling interfaces and damaged support/shotcrete work prior to exposing crews or reopening a restricted mine work area. Fill real mine zone, work order, shift, permit and contractor supervisor.

FIVE MINE-OWNED SOURCE HOLD / RELEASE GATES

1. Workface barricaded with area isolation current

2. Engineer-approved design and competence evidenced

3. Specified support/shotcrete/bolt installation inspected

4. Required pull/torque/strength testing accepted

5. Mine ground-control authority releases reoccupation

HOW TO COMPLETE THE ORIGINAL WORD RECORD

Complete all five original HOLD TRIGGER / EVIDENCE GATE entries with engineering design, material and inspection evidence, measured testing, RESULT / REFERENCE / WITNESS and appointed mine representative's reoccupation reference.

HOST MINE STATUTORY AND TECHNICAL AUTHORITY

A contractor handover record or completed bolt test cannot alone authorise people to return. The mine-appointed ground-control authority must accept actual conditions and grant permission.

TRACEABLE MINING PERMIT AND EVIDENCE CONTROL

Retain the true mine work order, affected area, competent person, permitted scope, current COP/SOP, source record/revision, technical test, restrictions and dated release. The source-original editable Word records contractor evidence and responsible review; it never independently issues mine access clearance, structural reoccupation permission, critical-system authority or an operator's start authorisation.

BUY THE SINGLE OR COMPLETE UNDERGROUND FILE

This R12.95 AB-H06 source Word is included in the full 371-document Underground Mining Checklist Package and 628-page Contractor Health and Safety File. Owners of either package should avoid duplicate buying. Mine-approved technical authorisations and genuine source signatures still govern the job.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page