32 - AB-H06 | Underground Ground Support Repair & Area Reoccupation Hold
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95
AB-H06 — UNDERGROUND GROUND SUPPORT REPAIR & AREA REOCCUPATION HOLD
Five source-original mine ground-support hold gates require current workface barricading, engineer-approved support repair and competence, inspected support/shotcrete/bolting installation, verified torque/pull/strength tests, and mine ground-control authorisation to reoccupy.
APPROVED UNDERGROUND MINE WORK APPLICATION
Use during underground ground-support repairs, rehabilitation, scaling interfaces and damaged support/shotcrete work prior to exposing crews or reopening a restricted mine work area. Fill real mine zone, work order, shift, permit and contractor supervisor.
FIVE MINE-OWNED SOURCE HOLD / RELEASE GATES
1. Workface barricaded with area isolation current
2. Engineer-approved design and competence evidenced
3. Specified support/shotcrete/bolt installation inspected
4. Required pull/torque/strength testing accepted
5. Mine ground-control authority releases reoccupation
HOW TO COMPLETE THE ORIGINAL WORD RECORD
Complete all five original HOLD TRIGGER / EVIDENCE GATE entries with engineering design, material and inspection evidence, measured testing, RESULT / REFERENCE / WITNESS and appointed mine representative's reoccupation reference.
HOST MINE STATUTORY AND TECHNICAL AUTHORITY
A contractor handover record or completed bolt test cannot alone authorise people to return. The mine-appointed ground-control authority must accept actual conditions and grant permission.
TRACEABLE MINING PERMIT AND EVIDENCE CONTROL
Retain the true mine work order, affected area, competent person, permitted scope, current COP/SOP, source record/revision, technical test, restrictions and dated release. The source-original editable Word records contractor evidence and responsible review; it never independently issues mine access clearance, structural reoccupation permission, critical-system authority or an operator's start authorisation.
BUY THE SINGLE OR COMPLETE UNDERGROUND FILE
This R12.95 AB-H06 source Word is included in the full 371-document Underground Mining Checklist Package and 628-page Contractor Health and Safety File. Owners of either package should avoid duplicate buying. Mine-approved technical authorisations and genuine source signatures still govern the job.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

