316 - AT-F01 | Blast Interface Approved Work Package Hold & Release
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — AUTHENTIC EDITABLE WORD | R12.95
AT-F01 — BLAST INTERFACE APPROVED WORK PACKAGE HOLD & RELEASE
A five-gate work-package hold for support contractors near mine-controlled exclusion zones. Original witness evidence protects the mine operator's exclusive control of access and release.
WHERE THE REAL UNDERGROUND SOURCE APPLIES
Use before handing back an approved service workpack. Enter MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. Tie each of five hold gates to approved zone and appointed mine witness.
FIVE PRINTED MINE WORK-PACKAGE HOLD ITEMS
1. All charging, firing and explosive custody are controlled solely by mine-authorised persons
2. Contractor task does not unintentionally enter magazine or blast exclusion area
3. Blast schedule, guards, communications and clearance signals confirmed each shift
4. Misfire and post-blast re-entry prohibitions briefed and documented
5. Hot work, electrical, radio and mobile plant activities screened near explosives
HOW TO COMPLETE THE ORIGINAL FIELDS
Record HOLD TRIGGER / EVIDENCE GATE, REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS, marking incomplete proof as HOLD. Contractor signatures cannot grant mine-area release.
REVIEW, DEFECTS AND MINE AUTHORITY
The source demands all applicable hold items PASS, evidence traceable to the approved mine work order, witnessed correction of defects and release by the named mine official. Actual contractor and host signatures record the decision; no permission is implied.
THE SINGLE WORD DOCUMENT VERSUS THE FULL COLLECTION
This R12.95 original editable AT-F01 Word file is already part of the 371-form Underground Mining Checklist Package and complete 628-page Contractor H&S File. If you own either collection, avoid buying the same Single twice. Real site COPs, mine-only appointments, legally required permits and official access permissions remain essential.
WHAT THE BUYER ACTUALLY RECEIVES
The paid download is the same original editable Word document held in the AVC underground mining source library. Complete the source's actual evidence fields and preserve the mine's controlled approvals, dated signatures and supporting inspection records rather than substituting generic certificates.
THREE BLUE AVC SHOPPING LINKS
Browse original AVC checklist Singles