AT-C02 — BLAST INTERFACE SHIFT & AREA READINESS CHECKLIST
The original seven-point readiness checklist begins with the contractor remaining outside restricted mine areas and ends with written mine officer re-entry release. It is a shift check, not an access permit.
WHERE THE REAL UNDERGROUND SOURCE APPLIES
Use at a new shift or changed contractor workface. Identify MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR, plus the current mine-controlled clearance authority.
SEVEN PRINTED WORKFACE SAFETY CHECKS
1. Contractor task does not unintentionally enter magazine or blast exclusion area
2. Blast schedule, guards, communications and clearance signals confirmed each shift
3. Misfire and post-blast re-entry prohibitions briefed and documented
4. Hot work, electrical, radio and mobile plant activities screened near explosives
5. Fire and static/electrical ignition risks assessed with mine authorised officials
6. Contractor materials and tools accounted for before area evacuation
7. Mine blasting officer provides written area re-entry release before work resumes
HOW TO COMPLETE THE ORIGINAL FIELDS
Tick actual Y / N / N/A outcomes under WORKFACE VERIFICATION / REQUIRED CONTROL and record EVIDENCE / DEFECT / ACTION. The source requires explanations for NO and N/A and renewed review when conditions change.
REVIEW, DEFECTS AND MINE AUTHORITY
The printed HOLD rule requires stopping when mine-authorised clearance, emergency safeguards, safe conditions or critical proof is missing. Reassess after changed shifts or conditions; record review references and host mine sign-off where required.
THE SINGLE WORD DOCUMENT VERSUS THE FULL COLLECTION
This R12.95 original editable AT-C02 Word file is already part of the 371-form Underground Mining Checklist Package and complete 628-page Contractor H&S File. If you own either collection, avoid buying the same Single twice. Real site COPs, mine-only appointments, legally required permits and official access permissions remain essential.
WHAT THE BUYER ACTUALLY RECEIVES
The paid download is the same original editable Word document held in the AVC underground mining source library. Complete the source's actual evidence fields and preserve the mine's controlled approvals, dated signatures and supporting inspection records rather than substituting generic certificates.
THREE BLUE AVC SHOPPING LINKS
Browse original AVC checklist Singles