AT-C01 — BLAST INTERFACE WORKFACE PRESTART CHECKLIST
The genuine seven-item prestart record begins by confirming that explosive custody and blasting remain exclusively with mine-authorised personnel, separating contractor support duties from mine operator work.
WHERE THE REAL UNDERGROUND SOURCE APPLIES
Use before approved contractor maintenance or services near a guarded area. Enter MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR using real mine boundaries and restrictions.
SEVEN PRINTED WORKFACE SAFETY CHECKS
1. All charging, firing and explosive custody are controlled solely by mine-authorised persons
2. Contractor task does not unintentionally enter magazine or blast exclusion area
3. Blast schedule, guards, communications and clearance signals confirmed each shift
4. Misfire and post-blast re-entry prohibitions briefed and documented
5. Hot work, electrical, radio and mobile plant activities screened near explosives
6. Fire and static/electrical ignition risks assessed with mine authorised officials
7. Contractor materials and tools accounted for before area evacuation
HOW TO COMPLETE THE ORIGINAL FIELDS
Record each source WORKFACE VERIFICATION / REQUIRED CONTROL with Y / N / N/A and EVIDENCE / DEFECT / ACTION. Attach work-order proof and retain reviewed defects, rather than assuming a completed prestart grants permission.
REVIEW, DEFECTS AND MINE AUTHORITY
The printed HOLD rule requires stopping when mine-authorised clearance, emergency safeguards, safe conditions or critical proof is missing. Reassess after changed shifts or conditions; record review references and host mine sign-off where required.
THE SINGLE WORD DOCUMENT VERSUS THE FULL COLLECTION
This R12.95 original editable AT-C01 Word file is already part of the 371-form Underground Mining Checklist Package and complete 628-page Contractor H&S File. If you own either collection, avoid buying the same Single twice. Real site COPs, mine-only appointments, legally required permits and official access permissions remain essential.
WHAT THE BUYER ACTUALLY RECEIVES
The paid download is the same original editable Word document held in the AVC underground mining source library. Complete the source's actual evidence fields and preserve the mine's controlled approvals, dated signatures and supporting inspection records rather than substituting generic certificates.
THREE BLUE AVC SHOPPING LINKS
Browse original AVC checklist Singles