312 - AT-00 | Fuel, Lubricant & Refuelling Work-Order Activation
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Qualifying AVC Singles: buy five for four, ten for eight or fifteen for twelve. Check the cart offer.
Browse individual checklist Singles
312 / AT-00 — FUEL/REFUELLING WORK-ORDER ACTIVATION AND MINE ACCEPTANCE
AT-00 is AVC's original editable one-page Word mine fuel/refuelling work-order activation and mine acceptance register. Its SIX control questions ensure a contractor has evidence and a named accepting owner for the exact fuel-farm, lubricant-unit or service-area job BEFORE maintenance begins.
WHY THIS SPECIFIC MINE FUEL RECORD MATTERS
A purchase or maintenance work order alone does not authorise entry to a hazardous fuel area, tank sampling or isolating a working transfer system. Chemical inventory, ignition restrictions, static bonding, emergency containment and mine-approved gas testing are activation dependencies.
SIX PRINTED WORK-ORDER ACTIVATION QUESTIONS
1. Fuel/chemical inventory and mine-approved service area established before maintenance. 2. Hazardous-area classification, ignition restriction and hot-work exclusion verified. 3. Fuel tanks, pump pressure, electrical, hydraulic energy and lines isolated/drained.
4. Static bonding, earthing, lightning protection and transfer hoses inspected. 5. Spill booms, bunds, contaminated-soil arrangements and fire coverage ready. 6. Flammable-liquid sampling or tank entry only by mine permit and gas testing.
SOURCE FORM FIELDS, REAL EVIDENCE AND MINE ACCEPTANCE
The original uses a THREE-COLUMN matrix: ACTIVATION / CONTROL QUESTION, DOCUMENT / PERMIT / EVIDENCE REFERENCE and OWNER / ACCEPTANCE. It does not contain a Y/N checklist or printed measured-values column. Enter true authorisation and equipment/work zone references for the six questions.
REVIEW / CLOSE-OUT uses CONTRACTOR SUPERVISOR / SIGNATURE, MINE RELEASE AUTHORITY / SIGNATURE and DATE / RELEASE REF. Without host mine authorisation the scope remains inactive, regardless of whether an internal contractor has signed the activation questions.
ONE WORD SINGLE OR COMPLETE SURFACE MINE COLLECTION?
This original purchaser-licensed editable DOCX is already INCLUDED in the 386-document Surface Mining Checklist Package and the complete Surface Mining Contractor H&S File with A–AA core controls and trade-specific annexures. Existing full collection purchasers already receive this form. Observe host-mine ignition, fuel/fire, permit and hazardous-area procedures.

