31 - AB-H05 | Underground Ventilation Alteration & Re-entry Hold
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95
AB-H05 — UNDERGROUND VENTILATION ALTERATION & RE-ENTRY HOLD
This source-original AB-H05 underground mine operator-controlled release/hold record contains 5 real printed source control points, rather than generic replacement material. Each point below is taken from the actual Word document being sold.
WHEN TO USE THIS MINE WORKPACK
Use for the activity described in this Underground Ventilation Alteration & Re-entry Hold at the authorised underground mine area, level, work order and shift. Complete the source's MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR details before assessing any site-specific hazard.
FIVE GENUINE MINE RELEASE EVIDENCE GATES
1. Work zone released by mine ventilation authority
2. Temporary works or airflow change accepted
3. Worker withdrawal or alternative protected environment verified
4. Post-change gas and airflow measurements accepted
5. Mine ventilation re-entry release documented
COMPLETING THE REAL EDITABLE WORD FIELDS
For each original HOLD TRIGGER / EVIDENCE GATE record REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS. Attach actual acceptance and the mine operator's permission, not a prefilled or assumed release.
STOP WORK, MINE PERMITS AND RE-ENTRY LIMITS
The original RELEASE CONDITION requires all relevant holds PASS, witnessed corrections and an authorised host mine representative's release. Contractor completion is evidence only; it is never independent permission to re-enter or restart.
RECORD THE ACTUAL TECHNICAL AND APPROVAL EVIDENCE
Record the named mine work-area owner, active site Code of Practice/SOP, technical restrictions, responsible mine control-room contact, source-approved equipment or system status and the real time/authority of any change. Keep independent measurements, inspections, defective-control actions, revised permissions and host approval together with this editable Word original.
BUY THIS SINGLE OR THE COMPLETE UNDERGROUND PACKAGE
This R12.95 AB-H05 Word original already appears in the full 371-document Underground Mining Checklist Package and the 628-page Contractor H&S File. Existing collection owners should avoid a duplicate purchase. Mine technical and emergency responsibilities remain with the appropriately appointed operator and competent persons.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

