309 - AS-TT02 | Waste-Rock, Stockpile & Tailings Mine Handover Talk
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Qualifying Singles: five for four, ten for eight or fifteen for twelve. Check the cart saving.
309 / AS-TT02 — WASTE-ROCK, STOCKPILE & TAILINGS MINE OPERATING INTERFACE AND HANDOVER
AS-TT02 is the original one-page editable Word operational-interface handover talk for waste-rock dumps, stockpiles and tailings perimeter work. It starts with the current crest/foundation and seepage stability plan before coordinating excavation, weather, instrumentation and evacuation.
WHY THIS IS A MINE GEOTECHNICAL SAFETY CONTROL
A contractor may be tasked with a trench or drain but still be operating beside a changing embankment or below a stockpile slope. The mine's geotechnical plan and exclusion envelope take precedence over the contractor's schedule. Damage to underdrains or piezometers may compromise surveillance.
SIX ORIGINAL WORKFACE BRIEFING POINTS
1. Crest and foundation stability, seepage, settlement and access governed by current plan. 2. Tipping, trenching and pipework only inside engineer-approved limits. 3. Stormwater diversion and weather triggers monitored for erosion/overtopping.
4. Buried drains, decant, underdrain and monitoring locations surveyed before digging. 5. Piezometers, instrument points and survey markers protected from damage. 6. Emergency withdrawal route and downstream exposures communicated to all crews.
BRIEFING ATTENDANCE, WITHDRAWAL AND RESTART
Record MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER, then use the 16 NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE attendance lines. Its six workface topics move from CURRENT STABILITY PLAN and engineer limits through stormwater, buried drain surveys and instrument protection to downstream withdrawal awareness. It is an operating-interfaces crew briefing, not a new authorisation to tip, trench, divert water or reinstall tailings facilities.
STOP / WITHDRAW / NOTIFY MINE CONTROL if seepage surges, tension cracks appear, embankment deforms or the operating boundary is disputed. Restart ONLY after mine-authorised release; a toolbox talk is not engineering permission.
ONE SPECIALIST SINGLE OR THE COMPLETE MINING SYSTEM?
The identical original editable purchaser-licensed DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and in the full Contractor H&S File with A–AA core controls and other specialist annexures. Existing larger-set buyers already own it. Host-mine geotechnical, TSF, access and excavation permits always control.

