top of page

308 - AS-TT01 | Waste-Rock, Stockpile & Tailings Critical Hazards Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying Singles: five for four, ten for eight or fifteen for twelve. Check the cart saving.

Browse all checklist Singles

308 / AS-TT01 — WASTE-ROCK, STOCKPILE & TAILINGS CRITICAL HAZARDS AND CREW ACCOUNTABILITY

AS-TT01 is the original one-page editable Word critical-hazard crew briefing for contractors at waste-rock dumps, stockpiles and tailings-facility boundaries. Its FIRST source item assigns the responsible tailings/dump engineer control of the work envelope and exclusion area.

WHY THIS IS A MINE GEOTECHNICAL SAFETY CONTROL

A seemingly routine survey or excavation beside a tailings perimeter can encounter a tension crack, changed settlement or a buried underdrain. The work crew needs a common understanding of engineering boundaries and the monitoring points they must not damage.

SIX ORIGINAL WORKFACE BRIEFING POINTS

1. Responsible tailings/dump engineer establishes allowed work envelope and exclusions. 2. Crest and foundation stability, seepage, settlement and access follow current plan. 3. Tipping, trenching or pipework prohibited outside engineer-approved limits.

4. Weather and stormwater-diversion triggers monitored for overtopping/erosion. 5. Buried drains, decant/underdrains and instrument locations surveyed before digging. 6. Piezometers, monitoring instruments and survey markers protected and tracked.

BRIEFING ATTENDANCE, WITHDRAWAL AND RESTART

Record MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER, then use the 16 NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE attendance lines. Unlike the operating interface talk, AS-TT01 starts with the responsible engineer's defined exclusion and permissible work area, then covers stability, tipping limits, stormwater, service surveys and instrument protection. Crew attendance records accountability, not a statutory geotechnical design approval.

STOP / WITHDRAW / NOTIFY MINE CONTROL if seepage surges, tension cracks appear, embankment deforms or the operating boundary is disputed. Restart ONLY after mine-authorised release; a toolbox talk is not engineering permission.

ONE SPECIALIST SINGLE OR THE COMPLETE MINING SYSTEM?

The identical original editable purchaser-licensed DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and in the full Contractor H&S File with A–AA core controls and other specialist annexures. Existing larger-set buyers already own it. Host-mine geotechnical, TSF, access and excavation permits always control.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page