308 - AS-TB-03 | High-Reach Boom Stow & Stop-Work Toolbox Talk
Buy 4 Checklists, Get 1 Free
AIRPORT LIFTING RISK THIS ORIGINAL CONTROLS
AS-TB-03 is the actual nine-point high-reach lifting toolbox talk about stopping unsafe crane or MEWP work and verifying boom stow before an airport area is returned to operations. A raised boom may penetrate protected obstacle-limitation surfaces, while crane swing can cross aircraft routes. A general lifting plan cannot itself authorise an airport movement. The briefing links the real workfront, lift plan, outrigger pads and stop-work authority.
WHEN AND HOW TO COMPLETE IT
Brief the airport lifting crew before setting up high-reach equipment, a crane or mobile elevating work platform. Identify the actual location, client permit, escorted access, authorised window, planned height and affected airport assets. Discuss obstacle clearance, crane swing and who decides when to cease lifting, stow the boom, reconcile tools and obtain the operator's separate approval. Rebrief after wind, route or aircraft-stand changes.
SOURCE-VERIFIED PRINTED POINTS OR HOLD GATES
NINE printed source talk points: (1) airport location, permit, escort, work window/assets; (2) OBSTACLE LIMITATION SURFACE PENETRATION hazard; (3) SWING OVER AIRCRAFT ROUTES and changed conditions; (4) HIGH-REACH STOP-WORK/BOOM STOW with approved LIFT PLAN; (5) no improvised isolations, bypasses, barriers, machinery restart or stand moves; (6) protect aircraft/passengers against dropped items, fumes, dust and FOD; (7) verify OUTRIGGER PADS; (8) STOP and contact airport operations for alarms, aircraft conflict, missing tool or incident; (9) FOD clearance and written outstanding-restriction handover.
EVIDENCE, WITNESS AND AIRPORT RELEASE
The exact Word talk has SITE/SHIFT VARIATIONS, QUESTIONS AND FOLLOW-UP ACTIONS, sixteen attendee name/employee-number with signature rows, plus FACILITATOR, DATE/SHIFT and WORK REF. Record actual crane height, expected stow conditions and who must resolve permissions. Briefing attendance is not a crane inspection certificate, aerodrome obstacle approval or independent airport release.
SOURCE WORD AND FULL AVC PACKAGE OPTIONS
SOURCE-EXACT EDITABLE MICROSOFT WORD: This genuine AVC original costs R12.95 individually. The same form already appears in the 420-document Airports & Airside Checklist Package and full 659-page Airports Contractor Health and Safety File. Avoid buying identical forms twice. Eligible individual Singles may qualify for BUY 4 GET 1 FREE while the automatic checkout offer is active: five pay for four, ten pay for eight, fifteen pay for twelve. Confirm cart eligibility; packages are excluded. Airport obstacle permission, crane/MEWP permits, independent inspections, escorted workfronts and operating release remain separate.
Browse original AVC Checklist Singles

