top of page

307 - AS-C05 | Airport Lifting Shift Change & Restart Readiness

R 12,95Price

Buy 4 Checklists, Get 1 Free

AIRPORT LIFTING RISK THIS ORIGINAL CONTROLS

AS-C05 is the source-original eight-control SHIFT CHANGE, VARIATION AND RESTART READINESS checklist for airside cranes, rigging and MEWPs. A work package accepted for one shift may not remain safe when aircraft stands, wind, escorts or workfront load distribution change. An operator cannot assume an earlier boom-swing boundary or outrigger inspection still satisfies the current aircraft operating window.

WHEN AND HOW TO COMPLETE IT

Complete at AIRPORT/WORK ZONE, ASSET/LOCATION, PERMIT/WORK PACKAGE and SHIFT/DATE before lifting restarts following a shift, altered weather or temporary work-method change. Confirm current aircraft and passenger movements, authorised escort, driver and radio permissions, exclusion zones, approved lift plan and physical condition of outriggers and supporting pads. STOP if crane swing conflicts with operating aircraft routes.

SOURCE-VERIFIED PRINTED POINTS OR HOLD GATES

Eight source Y/N/N/A checks: (1) aircraft/passenger/airline movements and approved work window; (2) changed weather, visibility, wind, electrical condition and stand usage; (3) current escort, radio, driver, access and safety permits; (4) subcontractor boundaries, barriers and emergency exits; (5) SWING OVER AIRCRAFT ROUTES protections still effective; (6) OUTRIGGER PADS authority/inspection evidence rechecked; (7) revised method, risk review and approval for changed work or temporary bypass; (8) personnel, vehicles, equipment, FOD and open holds reconciled.

EVIDENCE, WITNESS AND AIRPORT RELEASE

Each original checkpoint has Y/N/N/A and EVIDENCE/DEFECT REFERENCE. Footer fields are UNRESOLVED ITEMS/RESTRICTIONS, CONTRACTOR VERIFIED BY/SIGNATURE, AIRPORT RELEASE REFERENCE, EVIDENCE REF/CORRECTIVE ACTION and DATE/TIME/STATUS. Missing rigging permission or unchecked pads create an open HOLD. The printed footnote confirms airport operational/safety release remains externally issued.

SOURCE WORD AND FULL AVC PACKAGE OPTIONS

SOURCE-EXACT EDITABLE MICROSOFT WORD: This genuine AVC original costs R12.95 individually. The same form already appears in the 420-document Airports & Airside Checklist Package and full 659-page Airports Contractor Health and Safety File. Avoid buying identical forms twice. Eligible individual Singles may qualify for BUY 4 GET 1 FREE while the automatic checkout offer is active: five pay for four, ten pay for eight, fifteen pay for twelve. Confirm cart eligibility; packages are excluded. Airport obstacle permission, crane/MEWP permits, independent inspections, escorted workfronts and operating release remain separate.

Browse original AVC Checklist Singles

420-document Airports Checklist Package

Complete 659-page Airports Safety File

    bottom of page