top of page

305 - AS-R03 | Airport Crane & Rigging Inspection/Test Evidence Register

R 12,95Price

Buy 4 Checklists, Get 1 Free

WHAT THIS SOURCE-ORIGINAL LIFTING RECORD CONTROLS

AS-R03 is the genuine INSPECTION, MEASUREMENT AND TEST EVIDENCE REGISTER for airport cranes, rigging, lifting equipment and mobile work platforms. The lift plan and outrigger pads cannot be accepted solely because plant was present and a competent operator signed attendance. This source connects each actual equipment or work-package inspection with the relevant technical criterion, result/calibration, defect rectification and witness evidence needed to support a defensible lifting hold or handback.

WHEN AND HOW TO COMPLETE IT

Open against AIRPORT/WORK ZONE, REGISTER CUSTODIAN, WORK ORDER/PERMIT REF and REVIEW DATE. Add a dated entry for the actual crane, MEWP, lifting accessory, ground-support inspection or permitted workfront event. Reference the approved lift plan and the actual outrigger pad acceptance evidence; record any applicable standard or load criterion only if it is specified for that job. Document retests and independent witnesses following NCR closeout.

REAL PRINTED INSPECTION POINTS OR COLUMNS

The source contains FIVE repeated columns: DATE/ASSET; TEST/STANDARD/LIMIT; RESULT/CALIBRATION; HOLD/NCR/RECTIFICATION; WITNESS/EVIDENCE. The specific AS trade checkpoint note names LIFT PLAN and OUTRIGGER PADS, and requires failed outcomes to be resolved before release. This is a repeatable inspection/test register, not a fixed five-question lift inspection. It contains no invented crane load or pad bearing-pressure limit.

EVIDENCE, DEFECTS AND AIRPORT RELEASE

The original provides OPEN ACTIONS/RETEST/LOCATION OF ATTACHED EVIDENCE, CONTRACTOR VERIFIED BY/SIGNATURE, DATE/TIME, EVIDENCE REF/CORRECTIVE ACTION and DATE/TIME/STATUS. Use those to tie a failed lifting inspection to remedial proof and the competent witness. Contractor verification does not grant the airport's obstacle-height permission, operational access or independently controlled return to service.

ORIGINAL WORD AND COMPLETE FILE OPTIONS

ORIGINAL EDITABLE WORD: This source-identical AVC DOCX is R12.95 as an individual Single. It is already inside the full 420-document Airports & Airside Checklist Package and complete 659-page Airports Contractor Health & Safety File with broader management controls. Avoid purchasing identical forms twice. Eligible individual Singles may receive BUY 4 GET 1 FREE while the automatic cart promotion applies: five cost four, ten cost eight, fifteen cost twelve. Verify actual checkout eligibility; packages are excluded. The airport separately controls work permits, obstacle limitation surfaces, crane and MEWP access, operating windows and competent independent releases.

Browse original AVC Checklist Singles

420-document Airports Checklist Package

Complete 659-page Airports Contractor Safety File

    bottom of page