top of page

303 - AS-C04 | Airport Lifting FOD & Tool Accountability Check

R 12,95Price

Buy 4 Checklists, Get 1 Free

WHAT THIS SOURCE-ORIGINAL LIFTING RECORD CONTROLS

AS-C04 is the genuine EIGHT-ROW FOD, MATERIALS AND TOOL ACCOUNTABILITY checklist for lifting, crane and mobile elevating platform work at a live airport. Loose fasteners, rigging items, packaging, covers or fallen equipment can enter aircraft routes, while a crane boom or temporary lift setup may intrude into protected obstacle surfaces. The original requires positive tool accountability, physical inspection and independent FOD clearance at handback.

WHEN AND HOW TO COMPLETE IT

Complete at AIRPORT/WORK ZONE, ASSET/LOCATION, PERMIT/WORK PACKAGE and SHIFT/DATE while issuing lifting equipment and before removing the crane or reopening the zone. Reconcile each worker's loose items, rigging consumables and dropped-object hazards. Secure waste against wind, jet blast and rotor downwash; check the approved lift plan and collection route so cleaners or riggers do not inadvertently enter live aircraft stands.

REAL PRINTED INSPECTION POINTS OR COLUMNS

EIGHT printed Y/N/N/A checks: (1) signed loose-item/tool count for every person; (2) packaging, rags, fixings and consumables contained; (3) covers/waste secure against jet blast and rotor wash; (4) no wires, loose bolts, sharp edges or particles; (5) FOD from OBSTACLE LIMITATION SURFACE/PENETRATION activity controlled; (6) LIFT PLAN workfront physically checked by supervisor; (7) approved collection route avoids live stands and baggage/security paths; (8) final INDEPENDENT FOD SWEEP before handback.

EVIDENCE, DEFECTS AND AIRPORT RELEASE

Every source checkpoint takes Y/N/N/A and EVIDENCE/DEFECT REFERENCE. Footer: UNRESOLVED ITEMS/RESTRICTIONS, CONTRACTOR VERIFIED BY/SIGNATURE, AIRPORT RELEASE REFERENCE, CORRECTIVE ACTION/EVIDENCE and DATE/TIME/STATUS. Missing tools, lifting loose objects or open site restrictions must remain recorded and rectified; this contractor record cannot issue operating-area permission.

ORIGINAL WORD AND COMPLETE FILE OPTIONS

ORIGINAL EDITABLE WORD: This source-identical AVC DOCX is R12.95 as an individual Single. It is already inside the full 420-document Airports & Airside Checklist Package and complete 659-page Airports Contractor Health & Safety File with broader management controls. Avoid purchasing identical forms twice. Eligible individual Singles may receive BUY 4 GET 1 FREE while the automatic cart promotion applies: five cost four, ten cost eight, fifteen cost twelve. Verify actual checkout eligibility; packages are excluded. The airport separately controls work permits, obstacle limitation surfaces, crane and MEWP access, operating windows and competent independent releases.

Browse original AVC Checklist Singles

420-document Airports Checklist Package

Complete 659-page Airports Contractor Safety File

    bottom of page