top of page

302 - AS-H02 | Waste-Rock, Stockpile & Tailings Independent Inspection

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying Singles: five for four, ten for eight or fifteen for twelve. Check cart terms.

Browse all checklist Singles

302 / AS-H02 — TAILINGS & STOCKPILE INDEPENDENT INSPECTION, WITNESS AND HANDBACK

AS-H02 is the original editable Word five-gate independent inspection and witnessed handback hold form for waste-rock stockpile and tailings perimeter works. It keeps contractor verification separate from the mine's engineering/TSF decision to return a plant or zone to service.

THE REAL GEOTECHNICAL RISK

A small excavation can damage monitoring instrumentation or weaken a tailings drain, while an apparently dry slope still needs attention to stormwater triggers. The five independent gates verify operating limits, surveyed buried systems, instrument protection and downstream emergency readiness before release.

FIVE INDEPENDENT EVIDENCE GATES

1. Tipping, trenching and pipework confined to engineer-approved limits. 2. Weather and stormwater-diversion triggers monitored for erosion or overtopping. 3. Buried drain, decant/underdrain and monitoring positions surveyed before digging.

4. Instruments, piezometers and survey markers protected and tracked. 5. Emergency withdrawal routes and downstream exposure communicated to contractors.

THE ORIGINAL FIELDS, EVIDENCE AND MINE AUTHORITY

Complete MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. Record witnessed independent evidence against each hold gate. The printed FIVE HOLD TRIGGER / EVIDENCE GATE rows have REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS. RELEASE requires all five verified, defects resolved and a valid work release by an authorised mine official; no contractor signature can substitute for that approval.

Contractor verification is not a mine permit. Only the authorised official records the valid RELEASE with separate supervisor and mine authority signatures, DATE / RELEASE REF.

INDIVIDUAL WORD FORM OR COMPLETE SURFACE MINE SYSTEM?

This exact original purchaser-licensed editable DOCX is ALREADY INCLUDED in the full 386-document Surface Mining Checklist Package and in the complete Contractor H&S File with additional core and trade-specific controls. Existing package/full-file buyers already receive it. Follow current host-mine geotechnical, TSF and work-zone permissions.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File