302 - AS-C03 | Airport Crane & MEWP Workface SIMOPS Inspection
Buy 4 Checklists, Get 1 Free
WHY THIS ORIGINAL AIRPORT LIFTING FORM EXISTS
AS-C03 is the original NINE-ROW WORKFACE CONDITION AND SIMULTANEOUS OPERATIONS inspection for airport cranes, rigging and mobile elevating work platforms. A permitted lift can become unsafe when a boom intrudes into a protected obstacle surface, swings over an aircraft route or conflicts with another trade. The source verifies real physical boundaries, lift-plan evidence and outrigger support rather than relying only on a generic operator declaration.
WHEN AND HOW TO COMPLETE IT
Complete at AIRPORT/WORK ZONE, ASSET/LOCATION, PERMIT/WORK PACKAGE and SHIFT/DATE before lifting begins and after a changed flight or vehicle operation. Compare the work order, drawings, asset and isolation boundary with the actual lift. Confirm airport authorisation, competent workers, supervision, escorts and the protected routes. Inspect boom clearance, swing barriers, approved lift-plan conditions and actual pad or ground support.
ACTUAL PRINTED CONTROLS OR TALK POINTS
NINE true Y/N/N/A controls: (1) work scope, asset, isolation boundary and drawings; (2) current airport permission and safety interface briefing; (3) competence, supervision and escort; (4) OBSTACLE LIMITATION SURFACE PENETRATION measures; (5) SWING OVER AIRCRAFT ROUTES exclusion/barriers; (6) LIFT PLAN physical condition and evidence; (7) OUTRIGGER PADS inspection and release requirements; (8) concurrent trades, aircraft/vehicle routes, public protection and FOD; (9) STOP and notify airport custodian after changed workfront or operating state.
PROOF, SIGNATURES AND OPERATOR RELEASE
The actual Word includes EVIDENCE/DEFECT REFERENCE against each Y/N/N/A item, UNRESOLVED ITEMS/RESTRICTIONS, CONTRACTOR VERIFIED BY/SIGNATURE, AIRPORT RELEASE REFERENCE, CORRECTIVE ACTION/EVIDENCE and DATE/TIME/STATUS. Record a changed boom clearance or unverified pad as an open HOLD. Only the airport's authorised owner issues operating, height and route release.
SOURCE WORD AND AVC FULL PACKAGE OPTIONS
AUTHENTIC SOURCE-EXACT EDITABLE WORD: R12.95 buys this single AVC original. The same form is already included in the complete 420-document Airports & Airside Checklist Package and 659-page Airports Contractor Health and Safety File. Avoid duplicate buying. Eligible individual Singles may qualify for BUY 4 GET 1 FREE while the actual automatic cart offer applies: 5 pay for 4, 10 pay for 8, 15 pay for 12. Verify at checkout; packages are excluded. Operating permits, airfield obstacle clearances, competent crane/MEWP inspections, height work, escorts and final airport approval remain independently required.

