top of page

301 - AS-F01 | Waste-Rock, Stockpile & Tailings Technical Hold and Release

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying Singles: five for four, ten for eight or fifteen for twelve. Confirm the cart offer.

Browse all checklist Singles

301 / AS-F01 — TAILINGS & STOCKPILE TECHNICAL HOLD AND WORK RELEASE

AS-F01 is the original editable Word five-gate technical HOLD and mine work-release record for tailings perimeter, waste-rock dump and stockpile contractors. Its primary gate is the responsible geotechnical/TSF engineer's authorised work envelope and exclusion limits.

WHY THIS ENGINEERING CONTROL MATTERS

Contractor access or excavation near an embankment can affect crest/foundation stability, buried drains or controlled stormwater routes. A completed maintenance instruction does not grant TSF work release. AS-F01 requires source evidence and independent witness references for five critical engineering conditions.

FIVE SOURCE HOLD / RELEASE GATES

1. Responsible tailings/dump engineer defines exclusion and permitted work envelope. 2. Crest and foundation stability, seepage, settlement and access controlled by current plan. 3. No tipping, trenches or pipework outside engineering approval limits.

4. Weather and stormwater diversions monitored against overtopping/erosion. 5. Buried drain, decant/underdrain and instrument locations surveyed before digging.

ACTUAL EVIDENCE FIELDS, HOLD AND MINE AUTHORITY

Identify MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. The source uses FIVE HOLD TRIGGER / EVIDENCE GATE rows with REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS. The original release line requires all five checks verified and defects resolved, then a valid work release recorded by the authorised mine official; no invented instrument rows or extra engineer tests.

After all independent hold gates and defects are resolved, CONTRACTOR SUPERVISOR / SIGNATURE and MINE RELEASE AUTHORITY / SIGNATURE plus DATE / RELEASE REF document the authorised mine release.

SINGLE EDITABLE WORD OR COMPLETE MINE SYSTEM?

The exact original editable purchaser-licensed DOCX is ALREADY INCLUDED in the full 386-document Surface Mining Checklist Package and the complete Surface Mining Contractor H&S File with core management controls and specialist trade annexures. Existing buyers of either full set already receive this form. Follow current TSF engineering and host-mine access/permit rules.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page