30 - AB-C25 | Underground Water Inrush & Emergency Pump Readiness
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95
AB-C25 — UNDERGROUND WATER INRUSH & EMERGENCY PUMP READINESS
This source-original AB-C25 underground mine mine-to-contractor workface verification contains 6 real printed source control points, rather than generic replacement material. Each point below is taken from the actual Word document being sold.
WHEN TO USE THIS MINE WORKPACK
Use for the activity described in this Underground Water Inrush & Emergency Pump Readiness at the authorised underground mine area, level, work order and shift. Complete the source's MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR details before assessing any site-specific hazard.
SIX SOURCE-ORIGINAL MINE WORKFACE CHECKS
1. Water hazard and underground levels identified
2. Pump duty/standby capacity checked with mine engineering
3. Flood trigger and escape route briefed
4. Valves, power and temporary bypass isolation coordinated
5. Emergency escalation contacts and reporting channel confirmed
6. Post-work water levels and pump restart verified
COMPLETING THE REAL EDITABLE WORD FIELDS
For each original WORKFACE VERIFICATION / REQUIRED CONTROL line tick Y, N or N/A and record EVIDENCE / DEFECT / ACTION. Explain every NO or N/A, keep inspection/test results and identify the host-mine official and work permit.
STOP WORK, MINE PERMITS AND RE-ENTRY LIMITS
The source HOLD instruction requires stopping when mine clearance, isolation, emergency response, support or other critical proof is missing. A ticked contractor checklist does not create a legal work permit or override mine safe-work control.
RECORD THE ACTUAL TECHNICAL AND APPROVAL EVIDENCE
Record the named mine work-area owner, active site Code of Practice/SOP, technical restrictions, responsible mine control-room contact, source-approved equipment or system status and the real time/authority of any change. Keep independent measurements, inspections, defective-control actions, revised permissions and host approval together with this editable Word original.
BUY THIS SINGLE OR THE COMPLETE UNDERGROUND PACKAGE
This R12.95 AB-C25 Word original already appears in the full 371-document Underground Mining Checklist Package and the 628-page Contractor H&S File. Existing collection owners should avoid a duplicate purchase. Mine technical and emergency responsibilities remain with the appropriately appointed operator and competent persons.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

