top of page

3 - AB-02-C01 | Underground Host Mine Codes & Acceptance Index

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE ORIGINAL EDITABLE WORD | R12.95

AB-02-C01 — UNDERGROUND HOST MINE CODES & ACCEPTANCE INDEX

This editable AB-02-C01 original underground mine workface verification document contains 8 genuine printed source release and verification points. It is not a generic substitute and does not issue mine approval.

SOURCE-ORIGINAL UNDERGROUND MINE APPLICATION

Use for Underground Host Mine Codes & Acceptance Index at the correct mine, level, working area and operator-controlled task. Record the mine company, work order, supervisor, permit, area-specific risk assessment and appointed host officials before work.

8 ACTUAL UNDERGROUND MINE VERIFICATION ITEMS

1. Host mine signed scope/order and designated work owner.

2. Applicable MHSA and mine-specific legal appointment matrix with responsibilities.

3. Current mandatory mine COPs, work standards and safe working procedures.

4. Ventilation, gas, strata, inundation, blasting and traffic zone rules.

5. Mine escape, refuge, communication, self-rescuer and disaster arrangements.

6. Medical/fitness and induction standards for specified underground exposure.

7. Required electronic or hard-copy document submission and owner acceptance.

8. Contractor H&S plan, competency, plant and change submissions formally accepted.

USING AND COMPLETING THE EDITABLE WORD SOURCE

Tick each printed RELEASE / VERIFICATION POINT YES, NO or N/A, explain failures in EVIDENCE / ACTION and include real site-specific evidence, operator approval and competent person decision.

CRITICAL MINE AUTHORITY AND STOP WORK

A critical NO, failed gate, incomplete inspection, unsafe zone or missing mine technical work release requires STOP, escalation and competent operator re-authorisation before work proceeds. Contractor sign-off alone never grants mining permission.

PROJECT-SPECIFIC RECORDS AND HOST-MINE APPROVAL

Keep genuine mine legal duties, applicable COP/SOP revisions, approved area and activity, worker and equipment acceptance, work orders, hazards, alarms, emergency plans, corrected findings, and signed mine-owner approval references. Review again after shifts, scope changes, new personnel or changing underground conditions.

INDIVIDUAL SOURCE OR COMPLETE MINE COLLECTION

This R12.95 AB-02-C01 source-original Word is included in the 371-document Underground Mining Checklist Package and 628-page Contractor Health and Safety File. Existing owners should avoid duplicate purchases. Site adaptation and mine-owned permission remain mandatory.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page