299 - AS-C02 | Airport Lifting Final Inspection & Handover Check

R 12,95Price

Buy 4 Checklists, Get 1 Free

WHAT THIS SOURCE-ORIGINAL LIFTING FORM CONTROLS

AS-C02 is the source-original EIGHT-CONTROL FINAL INSPECTION AND AIRPORT HANDOVER check for rigging, cranes and mobile elevating platforms. Successful lifting is not enough when a boom remains raised, counterweights or mats obstruct aircraft routes, a defective support system remains in place or airport work permits are still open. This checklist requires documentary and physical closeout before the airport operator can independently reopen the affected area.

WHEN AND HOW TO COMPLETE IT

Complete only after the approved lifting task, inspections, crane/MEWP removal and FOD checks. Enter AIRPORT/AREA, CONTRACTOR, WORK ORDER and AREA/SHIFT. Confirm the actual approved load and lift-plan documentation, support and exclusion conditions, independent lift witnesses, removal of equipment and workfront restrictions. Provide the completed evidence and outstanding actions to the AIRPORT/CLIENT REVIEWER for real acceptance.

SOURCE-VERIFIED CHECKS OR TABLE COLUMNS

EIGHT genuine YES/NO/N/A rows: (1) scope, installed assets and changes align with approved documentation; (2) LIFT PLAN AND LOAD CERTIFICATION; (3) GROUND/SUPPORT AND EXCLUSION INSPECTION; (4) CONTROLLED LIFT APPROVAL AND WITNESS; (5) EQUIPMENT REMOVAL/FOD CLEARANCE; (6) tools, materials, barriers and FOD reconciled from the airport zone; (7) work permits, isolations and temporary restrictions formally closed; (8) AIRPORT OPERATOR FINAL RELEASE. Do not invent load capacities, crane certificate numbers or additional requirements.

EVIDENCE, WITNESSING AND AIRPORT ACCEPTANCE

The source has CONTROL/EVIDENCE with YES, NO and N/A columns, ACTION/PERMIT/EVIDENCE REFERENCE, COMPLETED BY, AIRPORT/CLIENT REVIEWER and DATE/SIGN. Reconcile the actual airport release and any unresolved lift controls, rather than signing completion unconditionally. The original explicitly states that only the airport/airside operational authority issues controlled permits or release.

BUY THE EDITABLE WORD OR COMPLETE AVC FILE

AUTHENTIC EDITABLE SOURCE WORD: This exact original AVC DOCX is R12.95 as an individual Checklist Single. It already appears in the complete 420-document Airports & Airside Checklist Package and the full 659-page Airports Contractor Health & Safety File with the wider management framework. Avoid buying duplicate originals. Eligible individual Singles may qualify for BUY 4 GET 1 FREE while the automatic cart offer applies: 5 pay for 4, 10 pay for 8 and 15 pay for 12. Check checkout; bundles do not qualify. Aerodrome obstacle height, crane and MEWP permits, lifting certification, competent independent witnesses and operating release require separate airport authorisation.

Browse AVC Checklist Singles

420-document Airports Checklist Package

Complete 659-page Airports Contractor Safety File

    bottom of page