298 / AS-C01 — TAILINGS & STOCKPILE PRE-START AND MINE INTERFACE CHECKLIST
AS-C01 is the original editable Word seven-row pre-start checklist for mine stockpile, waste-rock and tailings perimeter contractors. It begins with the responsible engineer's exclusion boundary so workers know which activities and work areas the mine has actually authorised.
WHY THIS ENGINEERING CONTROL MATTERS
Plant can mobilise to a dump or tailings perimeter before the current geotechnical plan has been checked against changed settlement or water conditions. Unapproved trenching or broken instrument markers may interfere with foundation stability and mine surveillance. AS-C01 provides the correct pre-start interface.
SEVEN ORIGINAL WORKFACE SAFETY CONTROLS
1. Tailings/dump responsible engineer defines allowed work zone and exclusions. 2. Crest/foundation stability, seepage, settlement and access follow current plan. 3. Tipping, trenching and pipework remain inside engineering approval limits. 4. Weather and stormwater diversion checked against overtopping/erosion.
5. Buried drain, decant/underdrain and instrument locations surveyed before digging. 6. Piezometers, survey markers and instruments protected and tracked. 7. Withdrawal route and downstream exposure understood by contractor crews.
ACTUAL EVIDENCE FIELDS, HOLD AND MINE AUTHORITY
Identify MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. Each original WORKFACE VERIFICATION / REQUIRED CONTROL has Y, N, N/A and EVIDENCE / DEFECT / ACTION. Enter the work order and mine zone and attach current engineering limits, weather/drainage plan, marked buried services and survey controls. It is not a permit or a geotechnical certification.
HOLD requires stopping for missing clearance, isolation, protection or critical evidence and reassessing changed conditions. Separate contractor and mine release authority signatures plus DATE / RELEASE REF record review; this is not mine permission.
SINGLE EDITABLE WORD OR COMPLETE MINE SYSTEM?
The exact original editable purchaser-licensed DOCX is ALREADY INCLUDED in the full 386-document Surface Mining Checklist Package and the complete Surface Mining Contractor H&S File with core management controls and specialist trade annexures. Existing buyers of either full set already receive this form. Follow current TSF engineering and host-mine access/permit rules.