297 - AS-H01 | Airport Crane & MEWP Six-Gate Hold Release Record

R 12,95Price

Buy 4 Checklists, Get 1 Free

WHAT THIS SOURCE-ORIGINAL LIFTING FORM CONTROLS

AS-H01 is the original SIX-GATE INSPECTION AND HOLD/RELEASE RECORD for lifting, rigging, cranes and MEWP work inside a controlled airport. The height of a raised crane can conflict with protected aerodrome obstacle surfaces even if the mechanical lift was technically correct. The work must also show approved lift plans, safe ground support, controlled lifting witnesses and the removal of residual FOD before requesting the airport operator's own release.

WHEN AND HOW TO COMPLETE IT

Open at a designated airport crane or mobile platform STOP/HOLD point. Enter AIRPORT/AREA, CONTRACTOR, WORK ORDER and AREA/SHIFT. Verify flight-operations height clearance, actual certified lift plan and load, pad or surface conditions, exclusion controls, competent witness, and whether all crane/MEWP equipment has been removed. Do not close a hold based solely on the contractor's completion or an unverified obstacle-clearance assumption.

SOURCE-VERIFIED CHECKS OR TABLE COLUMNS

The SIX real hold/release gates are (1) AIRPORT WORK HEIGHT/OBSTACLE CLEARANCE; (2) LIFT PLAN AND LOAD CERTIFICATION; (3) GROUND/SUPPORT AND EXCLUSION INSPECTION; (4) CONTROLLED LIFT APPROVAL AND WITNESS; (5) EQUIPMENT REMOVAL/FOD CLEARANCE; and (6) AIRPORT OPERATOR FINAL RELEASE. This is a SIX-point original, not the eight-gate independent release checklist AS-H02.

EVIDENCE, WITNESSING AND AIRPORT ACCEPTANCE

Against each HOLD/RELEASE POINT the Word provides EVIDENCE REF., ACCEPTED BY and DATE/SIGN. It concludes with HOLD/NCR/DEVIATION REFERENCE and INDEPENDENT CHECK/SITE RELEASE REFERENCE. Record the actual airport custodian, relevant evidence and any open defects. A signed AVC contractor hold form never substitutes for the host airport's independent operating-area or obstacle clearance.

BUY THE EDITABLE WORD OR COMPLETE AVC FILE

AUTHENTIC EDITABLE SOURCE WORD: This exact original AVC DOCX is R12.95 as an individual Checklist Single. It already appears in the complete 420-document Airports & Airside Checklist Package and the full 659-page Airports Contractor Health & Safety File with the wider management framework. Avoid buying duplicate originals. Eligible individual Singles may qualify for BUY 4 GET 1 FREE while the automatic cart offer applies: 5 pay for 4, 10 pay for 8 and 15 pay for 12. Check checkout; bundles do not qualify. Aerodrome obstacle height, crane and MEWP permits, lifting certification, competent independent witnesses and operating release require separate airport authorisation.

Browse AVC Checklist Singles

420-document Airports Checklist Package

Complete 659-page Airports Contractor Safety File

    bottom of page