top of page

294 - AR-TT02 | Haul Roads & Fleet Traffic Operating Handover Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Check the cart offer.

Browse all checklist Singles

294 / AR-TT02 — HAUL-ROAD FLEET OPERATING INTERFACE AND DUMP-POINT HANDOVER

AR-TT02 is an original one-page editable Word mine operating-interface handover talk for haul trucks, traffic control, light vehicles and dump-point infrastructure. The FIRST control is dump-edge berm, approach angle and bearing capacity—because a vehicle may leave a good haul road and enter an unsafe tip head.

WHY THIS MINE HAUL TRAFFIC CONTROL IS CRITICAL

A route can be well graded yet its dump berm unstable or its turn radius unsuited to the truck operating on it. Other crews may be altering signs, drainage and work-zone barriers while haul traffic continues. AR-TT02 coordinates these interfaces before the workface opens.

SIX REAL PRINTED WORKFACE BRIEFING POINTS

1. Dump-edge berm, truck approach angle and tip-head bearing assessed before access. 2. Spotters, radios and light-vehicle separation maintained. 3. Road width, grade, curvature, sight line and speed class fit actual trucks.

4. Rain, dust, ice, fog and visibility speed restrictions communicated. 5. Proximity/collision warnings, signs and route changes commissioned. 6. Roadwork barricades, safe pull-offs, drainage and emergency access maintained.

SOURCE ATTENDANCE AND MINE WITHDRAWAL RULE

Enter MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER. The original provides 16 NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE lines. The six original workface points begin with DUMP EDGE and truck approach conditions, not with an invented fleet-maintenance check. They then cover light-vehicle segregation, geometry, weather, collision systems and emergency access. Record who was briefed when the shift, route or controls change.

STOP / WITHDRAW / NOTIFY MINE CONTROL for unstable berm, unsignalled reversed traffic, poor visibility or unauthorised dump access. Mine-authorised official release is needed for restart.

PURCHASE ONE EDITABLE SINGLE OR COMPLETE MINE SYSTEM

This same original editable purchaser-licensed DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and full Contractor H&S File with specialist trade annexures. Buyers of the larger sets receive it already. Follow current mine dispatch, fleet, dump point and traffic management authority.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page