293 - AR-TT01 | Haul Roads & Fleet Traffic Critical Hazards Talk
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Check the cart offer.
293 / AR-TT01 — HAUL-ROAD FLEET CRITICAL HAZARDS AND CREW ACCOUNTABILITY
AR-TT01 is the original editable Word critical-hazards and crew-accountability toolbox talk for mine haulage routes, traffic devices and dump-point access. Its opening source point requires MINE ROADS OWNER approval of the traffic plan, intersections and active diversions.
WHY THIS MINE HAUL TRAFFIC CONTROL IS CRITICAL
Haul routes expose pedestrians and light-vehicle crews to very large trucks with long stopping distances and restricted sight lines. Dump berm defects, weather-reduced visibility and an incorrect detour can expose multiple crews. The talk makes approval, geometry and communications clear before entry.
SIX REAL PRINTED WORKFACE BRIEFING POINTS
1. Mine roads owner approves traffic plan, intersections and live route diversions. 2. Dump berm, truck approach angle and tip-head bearing condition checked. 3. Spotter presence, radio protocol and light-vehicle exclusion controlled.
4. Road width, slope/grade, curvature, sightline and speed class fit trucks. 5. Rain, dust, ice, fog and visibility restrictions passed to shift. 6. Collision/proximity warning, dynamic signs and route changes commissioned.
SOURCE ATTENDANCE AND MINE WITHDRAWAL RULE
Enter MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER. The original provides 16 NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE lines. The six original topics are road-owner authorisation FIRST, then dump-point condition, spotters, truck geometry, visibility restrictions and commissioned warning devices. A signed attendance list shows crew awareness of those actual hazards but does not replace a mine-approved traffic management plan.
STOP / WITHDRAW / NOTIFY MINE CONTROL for unstable berm, unsignalled reversed traffic, poor visibility or unauthorised dump access. Mine-authorised official release is needed for restart.
PURCHASE ONE EDITABLE SINGLE OR COMPLETE MINE SYSTEM
This same original editable purchaser-licensed DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and full Contractor H&S File with specialist trade annexures. Buyers of the larger sets receive it already. Follow current mine dispatch, fleet, dump point and traffic management authority.

