292 - AR-T01 | Haul Roads & Dump-Point Inspection & Acceptance Tests
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Check the cart offer.
292 / AR-T01 — HAUL-ROAD & DUMP-POINT INSPECTION, MEASUREMENTS AND ACCEPTANCE TESTS
AR-T01 is the original one-page editable Word inspection, measured results and acceptance-test record for mine haul roads, traffic control and dump-point structures. Seven source-defined checks link physical road geometry and tip-head access to documented warning-system tests and dispatch release.
WHY THIS MINE HAUL TRAFFIC CONTROL IS CRITICAL
A compliant-looking road may have a dump-edge berm that does not suit truck approach, a blind curve, or a collision warning system not tested after re-routing. This form requires actual measured or assessed evidence rather than a verbal statement that haulage can resume.
SEVEN ACTUAL ROAD/DUMP INSPECTION EVIDENCE ROWS
1. Dump edge berm, approach angle and tip-head bearing assessed before access. 2. Spotter coverage, radios and light-vehicle exclusion distance controlled. 3. Road width, grade, curvature, sight line and speed class match truck envelope. 4. Visibility/weather-based restrictions communicated to operating shifts.
5. Collision warning and dynamic signs tested after route changes. 6. Roadwork barricades, pull-offs, drainage and emergency access retained. 7. Mine dispatch signs return of diverted routes and documents notifications.
SOURCE MEASURED RESULTS AND MINE DISPATCH RELEASE
Enter MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. Each MINING-SPECIFIC ITEM / EVIDENCE TO TRACK has DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS. The original asks for traffic plan, berm inspection, dump assessment, collision-system test and dispatch-release evidence. Complete each real measurement/result and responsible authority; do not invent truck speed limits, berm dimensions or acceptance thresholds that have not been issued by the mine.
List unresolved issues under OUTSTANDING DEFECT / NCR / REINSPECTION / RETENTION FILE REF. Separate contractor and MINE RELEASE AUTHORITY signatures plus DATE / RELEASE REF identify the owner release.
PURCHASE ONE EDITABLE SINGLE OR COMPLETE MINE SYSTEM
This same original editable purchaser-licensed DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and full Contractor H&S File with specialist trade annexures. Buyers of the larger sets receive it already. Follow current mine dispatch, fleet, dump point and traffic management authority.

