top of page

290 - AR-R03 | Rail Work Results, Measurements & Evidence Register

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD R12.95

AR-R03 — RAIL WORK RESULTS, MEASUREMENTS & EVIDENCE REGISTER

AR-R03 is the genuine seven-row underground mine rail work results, measurements and evidence register. It first records traffic possession and isolation through mine control, then the physical and operational checks needed to document completed work.

WHERE AND WHEN THIS SOURCE IS USED

Use it to capture inspection and measurement outcomes for track gradients, rail points, haulage crossings and locomotive-related contractor service work. Enter MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR, anchored to the approved zone.

SEVEN PRINTED RAIL SAFETY EVIDENCE ITEMS

1. Rail traffic possession and isolation communicated through the mine control system

2. Track gradient, rail condition and stop blocks assessed before repairs

3. Rail-bound vehicle brakes, couplings and passenger rules checked

4. Shunting plan, lookout and radio protocols agreed with traffic controller

5. Track tools, welding, lifting and overhead clearances appropriately controlled

6. Crossings, refuges and interlocks protected during track work

7. Clearance, gauge, switch positions and test movements verified

HOW TO FILL THE ORIGINAL WORD TABLE

Complete original MINING-SPECIFIC ITEM / EVIDENCE TO TRACK, DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS columns with measured results and actual inspection source revisions. Retain proof of stop blocks, brake/coupling tests, shunting communications, interlocks and gauge/switch tests.

RAIL CONTROL, DEFECTS AND AUTHORISED RELEASE

A result without traceable possession or dated verification should not be accepted. Record open items in the source's NCR/reinspection and reviewer blocks. The rail controller retains authority over actual traffic opening.

SOURCE EVIDENCE AND SIGN-OFF

The source has OUTSTANDING DEFECT / NCR / REINSPECTION / RETENTION FILE REF and REVIEW / CLOSE-OUT AND EVIDENCE REFERENCES, with actual contractor and mine authority signatures and Date / release reference.

EDITABLE WORD SINGLE OR FULL COLLECTIONS

This original editable AR-R03 Word record costs R12.95 and is already in the 371-original Underground Mining Checklist Package and the full 628-page Contractor H&S File. Owners of either collection should not buy it twice. Actual mine COPs, traffic possession, inspections and official acceptance govern the work.

THREE BLUE AVC PRODUCT LINKS

Browse AVC checklist Singles

Underground Mining Checklist Package — 371 originals

Complete 628-page Underground Contractor H&S File

    bottom of page