289 - AR-R03 | Haul Roads & Fleet Traffic Work Results & Evidence
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Check the cart offer.
289 / AR-R03 — HAUL-ROAD FLEET WORK RESULTS, MEASUREMENTS AND EVIDENCE
AR-R03 is AVC's original one-page editable Word work-results and actual measurements record for surface-mine haulage, traffic controls and dumping infrastructure. The seven source subjects track plan permissions, geometric checks, alert-system evidence and workface safety decisions.
WHY ORIGINAL HAUL-ROAD EVIDENCE IS IMPORTANT
A route can be usable by a smaller mine vehicle yet unsuitable for a loaded haul truck. Wrong speed classification, poor sight line or untested proximity alerts are not resolved through a visual 'road open' note. Real measured and assessed results linked to the mine traffic plan are needed.
SEVEN SOURCE ROAD/FLEET EVIDENCE ROWS
1. Mine roads owner approves traffic plan, intersections and live route diversions. 2. Dump berm, truck angle and tip-head bearing checked before access. 3. Spotters, radio protocols and light-vehicle exclusion controlled. 4. Haul-road width, grade, curvature, sight line and speed class suit trucks.
5. Rain, dust, ice, fog and visibility restrictions communicated each shift. 6. Collision/proximity alerts, dynamic signs and traffic changes commissioned. 7. Road barricades, safe pull-offs, drainage and emergency access maintained.
USE THE ACTUAL WORD FIELDS AND MINE AUTHORITY
Complete MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. The MINING-SPECIFIC ITEM / EVIDENCE TO TRACK rows provide DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS. The source expressly requests traffic-plan, berm-inspection, dump-assessment, collision-system-test and dispatch-release evidence. Its FIRST row is the mine ROADS OWNER approving intersections/diversions; record actual width/grade/sight line and other measurements only from valid site evidence, not invented numbers.
Use OUTSTANDING DEFECT / NCR / REINSPECTION / RETENTION FILE REF for remaining work; contractor testing cannot substitute for mine release.
BUY THIS SINGLE OR THE COMPLETE SURFACE MINE COLLECTION
The exact original purchaser-licensed editable Word DOCX is ALREADY INCLUDED in both the 386-document Surface Mining Checklist Package and the complete Surface Mining Contractor H&S File with wider core and specialist controls. Buyers of these larger sets already have it. Follow the mine's current dispatch, roads and fleet safety rules.

