top of page

283 - AR-C01 | Rail Workface Prestart Checklist

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD R12.95

AR-C01 — RAIL WORKFACE PRESTART CHECKLIST

AR-C01 is the original seven-row workface prestart checklist for underground rail track, locomotives and crossings. The first printed condition verifies traffic possession and rail isolation through mine control before any maintenance begins.

WHERE AND WHEN THIS RAIL SOURCE APPLIES

Use it immediately before approved track repairs, points service, locomotive work or haulage crossing maintenance. Enter MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR, matching the current authorised rail work zone.

SEVEN ORIGINAL RAIL WORKFACE CHECKS

1. Rail traffic possession and isolation communicated through the mine control system

2. Track gradient, rail condition and stop blocks assessed before repairs

3. Rail-bound vehicle brakes, couplings and passenger rules checked

4. Shunting plan, lookout and radio protocols agreed with traffic controller

5. Track tools, welding, lifting and overhead clearances appropriately controlled

6. Crossings, refuges and interlocks protected during track work

7. Clearance, gauge, switch positions and test movements verified

HOW TO USE THE GENUINE PRINTED TABLE

Record Y, N and N/A plus EVIDENCE / DEFECT / ACTION for each original seven WORKFACE VERIFICATION / REQUIRED CONTROL items. Document controlled isolation, gradient/stop blocks, brake and coupling checks, shunting lookout/radio, welding/lifting clearance, protected crossings and gauge/switch testing.

RAIL TRAFFIC HOLD AND MINE RELEASE

The actual source says a checklist is not a work permit. The printed HOLD instruction requires stopping if rail possession, isolation or other critical mine safety evidence is absent; mine-only authorities decide entry and handback.

ORIGINAL REVIEW FIELDS AND SIGNATURES

The source includes REVIEW / CLOSE-OUT AND EVIDENCE REFERENCES, contractor supervisor and host mine authority signatures where required and actual Date / release reference. A prestart tick does not open the rail corridor.

SINGLE EDITABLE WORD OR THE COMPLETE COLLECTION

This R12.95 source-original editable AR-C01 Word form is already part of the 371-document Underground Mining Checklist Package and complete 628-page Contractor H&S File. Owners of either collection should not pay twice. Current mine COPs, traffic-control permits and competent official rail release prevail.

THREE BLUE AVC CROSS-LINKS

Browse AVC original checklist Singles

Underground Mining Checklist Package — 371 originals

Complete 628-page Underground Contractor H&S File

    bottom of page