280 - AQ-TT03 | Ground Support Shift Change & Near Miss Toolbox Talk
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE ORIGINAL EDITABLE WORD | R12.95
AQ-TT03 — GROUND SUPPORT SHIFT CHANGE & NEAR MISS TOOLBOX TALK
AQ-TT03 is the original shift-change and near-miss lessons toolbox talk for underground ground-support and rock rehabilitation contractors. Its first of six printed controls checks that pre-entry barring or scaling inspection follows the approved mine procedure.
WHEN AND WHERE TO USE THIS ORIGINAL
Use it before a new contractor shift enters a supported workface, after changed blast or seismic conditions, and following any near miss involving loose rock, mesh, bolting or support test evidence. Fill in MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER for the real work zone.
SIX GENUINE ROCK SUPPORT TOOLBOX CONTROLS
1. Pre-entry barring/scaling inspection carried out under approved procedure
2. Support bolts, resin, shotcrete, mesh and torque tests retain batch traceability
3. No drilling or scaling outside approved supported and barricaded workface
4. Seismic, blast and changed ground conditions trigger re-examination
5. Hold points identify test frequency and mine engineer release authority
6. Completed ground support inspected and released before others enter
HOW TO COMPLETE THIS EXACT WORD RECORD
Brief the six source items, beginning with pre-entry inspection, followed by resin/bolt/shotcrete batch traceability, supported barricaded limits, changed-ground reassessment, engineering test hold points and final inspection/release. Capture up to 16 source attendance signatures.
CRITICAL GROUND FALL AND WITHDRAWAL PROTECTION
A previous shift's safe-condition report cannot substitute for current rock-engineering clearance. The source requires STOP / WITHDRAW / NOTIFY MINE CONTROL for new cracks, falls of ground, voids, seismic warnings or failed support test; only the named mine authority releases.
SOURCE EVIDENCE AND MINE OFFICIAL SIGN-OFF
The original provides ATTENDANCE — 16 SIGNATURE LINES. Each attendee signs NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE; this only records that the talk took place, not mine-authorised ground clearance.
ONE WORD SINGLE OR FULL UNDERGROUND SAFETY COLLECTIONS
This original editable AQ-TT03 Word form costs R12.95. It is already included in the 371-document Underground Mining Checklist Package and full 628-page Contractor H&S File. Existing owners of either complete collection should not purchase it twice. Mine geotechnical design, COPs and official ground release govern all real use.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original editable checklist Singles

