top of page

279 - AQ-TT02 | Ground Support Safe Handover & Mine Interface Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE ORIGINAL EDITABLE WORD | R12.95

AQ-TT02 — GROUND SUPPORT SAFE HANDOVER & MINE INTERFACE TALK

AQ-TT02 is the source-original safe-handover and mine-interface briefing for contractor bolting, mesh installation, scaling and ground rehabilitation. Its first control reserves unsupported-span definition and safe-access sequencing to the competent mine rock engineer.

WHEN AND WHERE TO USE THIS ORIGINAL

Brief work teams before transferring an underground support zone to another shift, inspection team or contractor. Record MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER, and confirm the affected zone and mine-approved safe access sequence against current instruction.

SIX GENUINE ROCK SUPPORT TOOLBOX CONTROLS

1. Competent rock engineer defines zone, unsupported span and safe access sequence

2. Pre-entry barring/scaling inspection carried out under approved procedure

3. Support bolts, resin, shotcrete, mesh and torque tests retain batch traceability

4. No drilling or scaling outside approved supported and barricaded workface

5. Seismic, blast and changed ground conditions trigger re-examination

6. Hold points identify test frequency and mine engineer release authority

HOW TO COMPLETE THIS EXACT WORD RECORD

Review the six actual source checks from engineered support boundaries to pre-entry barring, material and torque batch records, barricaded workface access, seismic/blast reassessment, and test-frequency/release hold points. Use the genuine 16-name and signature attendance table.

CRITICAL GROUND FALL AND WITHDRAWAL PROTECTION

Handover cannot make unsupported ground safe. The source STOP / WITHDRAW rule applies to falling ground, cracks, unexpected voids, seismic warnings or failed tests. Restart only after mine-authorised ground release.

SOURCE EVIDENCE AND MINE OFFICIAL SIGN-OFF

The original provides ATTENDANCE — 16 SIGNATURE LINES. Each attendee signs NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE; this only records that the talk took place, not mine-authorised ground clearance.

ONE WORD SINGLE OR FULL UNDERGROUND SAFETY COLLECTIONS

This original editable AQ-TT02 Word form costs R12.95. It is already included in the 371-document Underground Mining Checklist Package and full 628-page Contractor H&S File. Existing owners of either complete collection should not purchase it twice. Mine geotechnical design, COPs and official ground release govern all real use.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original editable checklist Singles

Underground Mining Checklist Package — 371 originals

Complete 628-page Underground Mining Contractor H&S File

    bottom of page