top of page

279 - AQ-TT02 | Highwall & Geotechnical Mine Handover Toolbox Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Confirm the cart offer.

Browse all checklist Singles

279 / AQ-TT02 — HIGHWALL & BENCH OPERATING INTERFACE AND HANDOVER TALK

AQ-TT02 is the original editable Word six-point operating-interface and handover briefing for contractors near mine pit crests, toes, benches and geotechnical monitoring installations. Its FIRST workface control requires the mine geotechnical engineer to authorise drilling, surveying or access.

THE ACTUAL GEOTECHNICAL SAFETY DECISION

A survey contractor and a scaling crew can each be competent yet have different access boundaries, instrument alarms and work authorisations. If a prism moves or a blast changes the highwall, yesterday's drilling approval and barricade plan may no longer be adequate. This talk coordinates the authority and controls shared by those teams.

SIX ORIGINAL CREW BRIEFING CONTROLS

1. Mine geotechnical engineer approves drilling, surveying or crest/toe access. 2. Mine owner manages radar, prism and crack instrument status/threshold changes. 3. Current TARP governs warning, withdraw and restart conditions.

4. Assess rain, seismic change, dewatering, blasting and progressive failure each shift. 5. Fall-of-ground barriers and no-go areas stay intact around instrument maintenance. 6. Immediately escalate monitoring trends and alarms to geotechnical authority.

THE 16-SIGNATURE ATTENDANCE AND WITHDRAWAL RULE

Enter MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER, brief all relevant contractor crews, and use the source's 16 NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE lines.

The printed topics move from engineer access approval through monitoring ownership and TARP, then changed conditions and no-go barricades to immediate alarm escalation. It is a six-point briefing with 16 attendance signatures, not a geotechnical sensor calibration or measured results register. STOP / WITHDRAW / NOTIFY MINE CONTROL for ground cracks, triggered alarms, falling rock, new seepage or missing release; only the mine may authorise restart.

ONE ORIGINAL WORD SINGLE OR COMPLETE MINE SAFETY SYSTEM?

This same source-identical editable purchaser-licensed DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and in the complete Surface Mining Contractor H&S File alongside mine management controls and specialist annexures. Buyers of either larger set already receive the document. The mine geotechnical engineer and operator retain sole control over TARP, monitoring thresholds and access.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page