278 - AQ-TT01 | Ground Support Basic Critical Controls Toolbox Talk
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE ORIGINAL EDITABLE WORD | R12.95
AQ-TT01 — GROUND SUPPORT BASIC CRITICAL CONTROLS TOOLBOX TALK
AQ-TT01 is the original basic critical-controls toolbox talk for mine ground support, scaling and rock rehabilitation. It begins with current mine geotechnical and support standards and the approved design, rather than assumptions about safe excavation access.
WHEN AND WHERE TO USE THIS ORIGINAL
Use it before starting approved ground-support work on a defined face, heading or damaged mine zone. Record MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER and identify the authorised rock engineer, design revision and supported work limits.
SIX GENUINE ROCK SUPPORT TOOLBOX CONTROLS
1. Current mine geotechnical/support standard and approved design obtained
2. Competent rock engineer defines zone, unsupported span and safe access sequence
3. Pre-entry barring/scaling inspection carried out under approved procedure
4. Support bolts, resin, shotcrete, mesh and torque tests retain batch traceability
5. No drilling or scaling outside approved supported and barricaded workface
6. Seismic, blast and changed ground conditions trigger re-examination
HOW TO COMPLETE THIS EXACT WORD RECORD
Discuss the six printed source points in order: current support design, competent engineer-defined unsupported span, barring/scaling pre-entry inspection, traceable bolts/resin/shotcrete/mesh torque tests, supported and barricaded drilling/scaling limits, and new seismic or blast condition review. Capture 16 attendance lines.
CRITICAL GROUND FALL AND WITHDRAWAL PROTECTION
New fractures, voids, falling ground or a failed support test are a STOP / WITHDRAW / NOTIFY MINE CONTROL trigger. A signed briefing cannot substitute for approved support installation, mine geotechnical inspections or zone release.
SOURCE EVIDENCE AND MINE OFFICIAL SIGN-OFF
The original provides ATTENDANCE — 16 SIGNATURE LINES. Each attendee signs NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE; this only records that the talk took place, not mine-authorised ground clearance.
ONE WORD SINGLE OR FULL UNDERGROUND SAFETY COLLECTIONS
This original editable AQ-TT01 Word form costs R12.95. It is already included in the 371-document Underground Mining Checklist Package and full 628-page Contractor H&S File. Existing owners of either complete collection should not purchase it twice. Mine geotechnical design, COPs and official ground release govern all real use.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original editable checklist Singles

