277 / AQ-T01 — HIGHWALL & BENCH INSPECTION, MONITORING MEASUREMENTS AND ACCEPTANCE TESTS
AQ-T01 is AVC's original editable one-page Word mine highwall inspection and measured-evidence register for pit slope and bench monitoring support. It records genuine results, surveillance thresholds and mine geotechnical approval across seven source-defined controls—not a visual-only inspection.
THE ACTUAL GEOTECHNICAL SAFETY DECISION
Reliable slope monitoring depends on the relevant radar/prism/crack readings, TARP trigger definitions and the current hazard boundary. A reading outside the mine's alarm settings or a failure to escalate progressive movement cannot be closed by merely signing a work order. Formal, georeferenced mine release remains necessary.
SEVEN ORIGINAL MEASURED / ACCEPTANCE EVIDENCE ROWS
1. Mine geotechnical engineer approves drilling, survey and access near crest/toe. 2. Radar, prism and crack instruments/thresholds controlled by mine owner. 3. Current TARP defines warning, withdrawal and restart conditions. 4. Rain, seismic, dewatering, blast damage and progressive failure checked per shift.
5. Fall-of-ground barricades and restricted zones remain in place. 6. Trends and monitoring alarms immediately escalated to geotechnical authority. 7. Re-entry based on written or georeferenced mine engineering release.
USE ACTUAL MONITORING EVIDENCE AND MINE RELEASE
Identify MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. Each MINING-SPECIFIC ITEM / EVIDENCE TO TRACK has DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS. The source expressly calls for a TARP version, prism readings, radar alarm, current hazard map and mine engineering release. Enter the actual mine-controlled document IDs and measured values in the printed fields, not hypothetical displacement tolerances, assumed geology or a copied instrument report.
Use the printed OUTSTANDING DEFECT / NCR / REINSPECTION / RETENTION FILE REF for open issues. CONTRACTOR SUPERVISOR / SIGNATURE and MINE RELEASE AUTHORITY / SIGNATURE with DATE / RELEASE REF are separate, and no contractor can self-release the highwall.
ONE ORIGINAL WORD SINGLE OR COMPLETE MINE SAFETY SYSTEM?
This same source-identical editable purchaser-licensed DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and in the complete Surface Mining Contractor H&S File alongside mine management controls and specialist annexures. Buyers of either larger set already receive the document. The mine geotechnical engineer and operator retain sole control over TARP, monitoring thresholds and access.