top of page

275 - AQ-R03 | Ground Support Work Results & Evidence Register

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95

AQ-R03 — GROUND SUPPORT WORK RESULTS & EVIDENCE REGISTER

AQ-R03 is the source-original seven-item work results, measurements and evidence register for mine ground support, bolts, mesh, shotcrete and scaling. It starts with approved geotechnical design and ends with formal mine engineering test-frequency and release holds.

WHEN TO USE THIS UNDERGROUND SAFETY RECORD

Use it to document real measured results, support-material traceability and completed ground rehabilitation checks. Identify MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR for the current mine zone and approved rock-engineer limits.

SEVEN SOURCE-ORIGINAL GROUND SUPPORT CONTROLS

1. Current mine geotechnical/support standard and approved design obtained

2. Competent rock engineer defines zone, unsupported span and safe access sequence

3. Pre-entry barring/scaling inspection carried out under approved procedure

4. Support bolts, resin, shotcrete, mesh and torque tests retain batch traceability

5. No drilling or scaling outside approved supported and barricaded workface

6. Seismic, blast and changed ground conditions trigger re-examination

7. Hold points identify test frequency and mine engineer release authority

HOW TO COMPLETE THE SOURCE'S EVIDENCE TABLE

Record actual measurements in the original MINING-SPECIFIC ITEM / EVIDENCE TO TRACK, DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS fields. Cite torque/pull test data, resin and bolt batches, safe access verification and responsible witness with document revision.

GROUND SUPPORT FAILURE AND OPERATOR RELEASE

The seven source rows distinguish approved design, engineer-defined safe span, pre-entry barring, materials testing, workface barricades, changed seismic/blast conditions and official hold points. A measurement without source or reviewer is not a verified result.

DEFECTS, WITNESSES AND FINAL ACCEPTANCE

The source has OUTSTANDING DEFECT / NCR / REINSPECTION / RETENTION FILE REF, REVIEW / CLOSE-OUT AND EVIDENCE REFERENCES, contractor supervisor and host mine authority signatures where required and Date / release reference.

SOURCE WORD SINGLE OR COMPLETE MINE COLLECTIONS

The R12.95 editable AQ-R03 Word original is already within the 371-original Underground Mining Checklist Package and the full 628-page Contractor H&S File. If you own either containing collection, do not buy this form twice. Current geotechnical design, mine COPs, appointments and engineer-approved release govern work.

THREE BLUE AVC CROSS-LINKS

Browse AVC original editable checklist Singles

371-form Underground Mining Checklist Package

Complete Underground Mining Contractor H&S File — 628 pages

    bottom of page