top of page

275 - AQ-R03 | Highwall & Geotechnical Work Results and Measurements

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Confirm cart terms.

Browse all checklist Singles

275 / AQ-R03 — HIGHWALL & BENCH WORK RESULTS, MEASUREMENTS AND MONITORING EVIDENCE

AQ-R03 is the original one-page editable Word measurement and work-results evidence register for highwall, bench and geotechnical monitoring support. It records SEVEN printed controls linking real radar/prism observations to the current hazard map, TARP and mine engineer's assessment.

WHY THIS HIGHWALL EVIDENCE MATTERS

Slope monitoring is only defensible when readings are traceable to a known location, current alarm settings and a valid warning/withdraw response plan. An unrecorded prism movement or unchecked crack reading can mislead a team about whether crest access is safe. The source demands actual mine-controlled evidence rather than a generic pass/fail statement.

SEVEN ACTUAL GEOTECHNICAL EVIDENCE ROWS

1. Current geotechnical hazard map identifies unstable zones and alarms. 2. Engineer approves drilling, surveying and access near pit crest/toe. 3. Radar, prism and crack monitor thresholds controlled by the mine owner. 4. TARP defines warning, withdrawal and restart criteria.

5. Review rainfall, seismic, dewatering, blast damage and progressive failures. 6. Fall-of-ground barriers/no-go areas intact during monitoring work. 7. Monitoring trends and alarms escalated immediately to geotechnical authority.

SOURCE WORD FIELDS, TRUE EVIDENCE AND MINE RELEASE

Fill MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. Each printed MINING-SPECIFIC ITEM / EVIDENCE TO TRACK offers DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS. The original calls for measured/assessed evidence including TARP version, prism readings, radar alarms, hazard map and engineering release. Record the actual DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS. An apparently stable value does not itself constitute authority to re-enter a slope exclusion zone.

Use OUTSTANDING DEFECT / NCR / REINSPECTION / RETENTION FILE REF for open controls. Separate contractor and MINE RELEASE AUTHORITY signatures plus DATE / RELEASE REF document the accountable handback.

THIS ONE WORD SINGLE OR THE COMPLETE MINE SYSTEM?

This identical original editable purchaser-licensed DOCX is ALREADY INCLUDED in the complete 386-document Surface Mining Checklist Package and the full Contractor H&S File with core controls and specialist annexures. Existing larger-set buyers already own it. The host mine's current geotechnical hazard map, TARP, monitoring threshold and release authority always govern access.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page